The list of the wind energy assignments managed by CECL is given here along with brief description of the task and the name of the client and the year in which work was/is managed:
Upto 31/03/2018
Sl. | Description of Project | Client | Year | Status |
1 | Design of electrical control system for wind power generation in stand-alone and controlled mode. | Aeropower Pvt.Ltd.Bhopal | 1986 | Executed |
2 | System and detailed design for Stand-alone wind electric power generation system at Kukru, Betul, M.P. as pilot project of 50kW including design and supply of tower, erection, commissioning and maintenance for first year after putting into regular | M.P. Urja Vikas Nigam | 1986 | Executed |
3 | Feasibility Report on 2 MW Wind Farm at Kukru, Betul M.P. | M.P. Urja Vikas Nigam. | 1986 | Executed |
4 | Detailed Project Report on 2 MW Wind farm at Kukru, Betul, M.P. | M.P. Urja Vikas Nigam. | 1986 | Executed |
5 | Installation of 1 kW Wind Electric Battery Charger including design, supply and erection of tower at Bhopal. | M.P. Urja Vikas Nigam. | 1986 | Executed |
6 | Identification of sites for 1 kW Wind Electric Battery Charger for wide use in M.P. | M.P. Urja Vikas Nigam. | 1986 | Executed |
7 | Identification of sites, feasibility study, detail project design, supervision of site work and monitoring of 25 kW Stand-Alone Wind Electric Generators in U.P.,Himachal Pradesh and Rajasthan including co-ordination with Dutch manufacturers. | DNES, Ministry of Energy. | 1988 | Executed |
8 | Feasibility Mission on Wind-Diesel project at Lakshadweep | DANIDA, Govt. of Denmark | 1989 | Executed |
9 | Monitoring of 6 Nos. 90 kW grid connected Wind Electric Generators installed under DANIDA Scheme in M.P., Gujarat, Orissa, Maharashtra & Tamil Nadu including computer aided analysis of performance and availability of resources & co-ordination with | DNES, Ministry of Energy. | 1989 | Executed |
10 | Feasibility study and project report of effective utilization of biomass, solar and wind energy in Lakshadweep and Andaman & Nicobar group | DNES, Ministry of Energy. | 1989 | Executed |
11 | Preparation of Master Plan for development of Wind Farms (Total capacity 540 MW) in Tamil Nadu. | DNES,Ministry of Energy and Tamil Nadu Energy Development Agency. | 1990 | Executed |
12 | Study of existing Grid condition in Okha Madi 'Wind Farm, Gujarat and suggesting remedial measures. | Gujarat Energy Development Agency. | 1990 | Executed |
13 | Testing of 300 kW Wind Turbines before erection at Okha Madi Wind Farm | Gujarat Energy Development Agency. | 1990 | Executed |
14 | Preparation of Detailed Project Report for 1.6 MW Wind Farm At Vijaydurg, Maharashtra | Maharashtra Energy Development Agency | 1990 | Executed |
15 | Preparation of Detailed Project Report for 1.6 MW Wind Farm At Vijaydurg, Maharashtra at Elephanta Island. | Maharashtra Energy Development Agency | 1990 | Executed |
16 | Analysis of technical documents & data, scrutiny of drawings & specifications, construction supervision technical services to State Agencies, co-ordination with implementing agencies and overseas agencies for 20 MW Wind Farm being implemented | COWIconsult Denmark. | 1991 | Executed |
17 | Monitoring of 6 MW Kayathar,4 MW Muppandal and 10 MW Lamba DANIDA Wind Farm. | COWIconsult Denmark. | 1991 | Executed |
18 | Study of Retro-fitting proposal for Puri Windfarm | DANIDA, Govt. of Denmark | 1991 | Executed |
19 | Feasibility Study for 2 MW Wind Farms atTirumala & Ramagiri Hill in Andhra Pradesh. | NEDCAP, Hyderabad | 1991 | Executed |
20 | Preparation of Detailed Project Report for 2 MW Wind Farm at Kakulakonda in Andhra Pradesh. | Non-conventional Energy Dev. 'Corpn. of Andhra Pradesh. | 1991 | Executed |
21 | Preparation of Detailed Project Report for 2 MW Wind Farm at Ramagiri Hills in Andhra Pradesh. | Non-conventional Energy Dev. 'Corpn. of Andhra Pradesh. | 1991 | Executed |
22 | Preparation of Master Plan for Wind Power Development in the State of Andhra Pradesh | Non-conventional Energy Dev. 'Corpn. of Andhra Pradesh. | 1991 | Executed |
23 | Feasibility Mission on 50-100 MW Wind Farm in Tamil Nadu/Gujarat. | The World Bank | 1991 | Executed |
24 | Study of Grid and Providing Suggestions for improvement of transmission grid condition in Saurashtra and Kutchh area of Gujarat. | DANIDA, Govt. of Denmark | 1991 | Executed |
25 | Preparation & Evaluation of Tenders (WEG,Civil & Electrical) for 5 MW Windfarm Project at Jogimatti, Chitradurga district of Karnataka. | Graphite India Ltd., Calcutta | 1992 | Executed |
26 | Preparation of Detailed Project Report for 5 MW Wind Farm at Jogimatti Hills in Chitradurga District of Karnataka. | Karnataka Power Corpn.Ltd. | 1992 | Executed |
27 | Preparation & Evaluation of Tender Documents for 2MW Windfarm at Kappatgudda, Karnataka. | Karnataka Power Corpn.Ltd. | 1992 | Executed |
28 | Construction Supervision of 2 MW Windfarm at Kappatgudda, Karnataka. | Karnataka Power Corpn.Ltd. | 1992 | Executed |
29 | Preparation of Detailed Project Report for 2 MW Wind Farm at Kheda,Dist.Dhar,M.P. | M.P.Urja Vikas Nigam Ltd. | 1992 | Executed |
30 | Technical Feasibility cum Market Study for manufacture of Wind Turbine Generators in India. | I.J. Raju and Associates, Delhi | 1993 | Executed |
31 | Preparation of Project Document on Wind Farm Sector. | Indian Renewable Energy Development Agency Ltd. | 1993 | Executed |
32 | Conducting Logistic Studies for Developing 4MW Windfarm at Kappatgudda. | Karnataka Power Corpn.Ltd. | 1993 | Executed |
33 | Preparation of Tender Documents for procure-'ment of wind turbines & associated electrical and civil works for 1.5 MW Wind Farm at Vijaydurg. | Maharashtra Energy Development Agency, Bombay. | 1993 | Executed |
34 | Supervision of construction,erection and commissioning of 1.5MW Windfarm at Vijaydurg, Maharashtra. | Maharashtra Energy Development Agency,Bombay | 1993 | Executed |
35 | Preparation of Detailed Project Report & 'Tender Documents for a 10MW Wind Farm at Perungudi, Tamil Nadu | Mohan Breweries and Distilleries Ltd. Madras | 1993 | Executed |
36 | Preparation of Feasibility Report for a 15 MW Windfarm at Jamgod, Dist.Dewas, M.P. | AEC (India) Ltd.New Delhi | 1994 | Executed |
37 | Opportunity for wind energy sector qt various location in India | Industrial Development services Pvt.Ltd Asian Development Bank | 1994 | Executed |
38 | Consultancy Service for 4 MW Windfarm at Muppandal, Tamil Nadu (DPR). | Dalmia Cement (Bharat)Ltd. | 1994 | Executed |
39 | Preparation & Evaluation of Tender Documents for 4MW Windfarm at Muppandal, T.N. | Dalmia Cement (Bharat)Ltd. | 1994 | Executed |
40 | Preparation & Evaluation of Tender for 4 MW Windfarm | Dalmia Cement (Bharat)Ltd. | 1994 | Executed |
41 | Preparation of Tender Document for procurement of WEGs for 2 MW Phase-II windfarm and Micrositing at Muppandal, Tamil Nadu | Dalmia Cement (Bharat)Ltd. | 1994 | Executed |
42 | Supervision of construction,erection and commissioning for 2 MW Phase-II windfarm at Muppandal, Tamil Nadu. | Dalmia Cement (Bharat)Ltd. | 1994 | Executed |
43 | Preparation of Detailed Project Report for a 5 MW Wind Farm at Jogimatti,Chitradurga District of Karnataka. | I.T.C. Limited, Calcutta | 1994 | Executed |
44 | Preparation of Detailed Project Report for a 10 MW Wind Farm at Kethanur, Tamil Nadu | Kanishk Steel Industries Ltd., Salem | 1994 | Executed |
45 | Conducting Logistic Studies for Developing 5 MW Windfarm at Jogimatti Hills. | Karnataka Power Corpn.Ltd. | 1994 | Executed |
46 | Preparation & Evaluation of Tender Documents for 10 MW Wind Farm at Perungudi, Tamil Nadu. | Mohan Breweries and Distilleries Ltd. Madras | 1994 | Executed |
47 | Preparation of Detailed Project Report for 2 MW Wind Farm at Ransi, Pauri, U.P. | Non-Conventional Energy Development Agency, U.P. | 1994 | Executed |
48 | Preparation of Detailed Project Report for 4.5MW Wind Farm at Kappatagudda, Karnataka | Karnataka Power Corpn.Ltd. | 1995 | Executed |
49 | Preparation of Detailed Project Report & Tender Documents for a 15 MW Wind Farm at Jamgodrani, Dist. Dewas, M.P. | M.P. Windfarms Ltd. | 1995 | Executed |
50 | Supervision of construction,erection and commissioning of 10 MW Windfarm at Perungudi, Tamil Nadu | Mohan Breweries & Distilleries Ltd., Madras | 1995 | Executed |
51 | Preparation of Detailed Project Report for a 10MW Wind Farm at Dewas, M.P. | REPL Engineering Ltd.Bombay | 1995 | Executed |
52 | Preparation of Detailed Project Report for 10 MW Windfarm at Poolavadi, Dist. Coimbatore, T.N. | 20th Century Finance Corpn. Ltd., Bombay | 1996 | Executed |
53 | Preparation Tender Document for 10 MW Windfarm at Poolavadi, Dist. Coimbatore, T.N. | 20th Century Finance Corpn. Ltd., Bombay. | 1996 | Executed |
54 | Preparation of Detailed Project Report for a '4 MW Windfarm at Karunkulam, Dist. 'Kanyakumari, Tamil Nadu. | Dalmia Cement (Bharat) Ltd. 'Dalmiapuram | 1996 | Executed |
55 | Supervision of construction,erection and commissioning of 4MW Windfarm at Muppandal Tamil Nadu. | Dalmia Cement (Bharat)Ltd. | 1996 | Executed |
56 | Supervision of construction,erection and commissioning for 4 MW Phase-III windfarm at Muppandal, Tamil Nadu. | Dalmia Cement (Bharat)Ltd. | 1996 | Executed |
57 | Supervision of construction,erection and commissioning for 3 MW Phase-IV windfarm at Muppandal, Tamil Nadu. | Dalmia Cement (Bharat)Ltd. | 1996 | Executed |
58 | Supervision of construction,erection and commissioning for 2 MW windfarm at Karunakulam Dist. Kanyakumari, T.N. | Dalmia Cement (Bharat)Ltd. | 1996 | Executed |
59 | Preparation of Pre-feasibility Report for 5MW 'windfarm at Navadra, Dist. Jamnagar, Gujarat | Gujarat Mineral Development 'Corpn. Ahemadabad | 1996 | Executed |
60 | Preparation of Pre-feasibility Report for 5MW 'windfarm at Dhank, Dist. Rajkot, Gujarat | Gujarat Mineral Development 'Corpn. Ahemadabad | 1996 | Executed |
61 | Preparation of Master Plan for development of 'Windfarms at Dewas (M.P.), (52 MW) | M.P. Urja Vikas Nigam | 1996 | Executed |
62 | Construction Supervision of 15 MW Windfarm project at Jamgodrani, Distt. Dewas, M.P. | M.P. Windfarms Ltd. | 1996 | Executed |
63 | Preparation of Feasibility Report for a 5 MW Windfarm at Jetpura,Dist.Indore, M.P. | Madhya Bharat Papers Ltd., Calcutta. | 1996 | Executed |
64 | Preparation of Detailed Project Report for a 2 MW Windfarm at Fraserganj, West Bengal | West Bengal Renewable Energy Development Agency | 1996 | Executed |
65 | Preparation of Tender Document for 'Wind-Diesel Energy Generation in Agatti & Kavaratti Islands, Lakshadweep | Administration of the Union Territory 'of Lakshadweep | 1997 | Executed |
66 | Preparation of Master Plan for development of 50 MW Windfarms around Chikidi Windmast, Karnataka | NEPC-India Ltd, Chennai | 1997 | Executed |
67 | Investigation for High Windfarm Losses at 5.6 MW IPCL Windfarm at Gujarat | NEPC-India Ltd, Chennai | 1997 | Executed |
68 | Preparation of Master Plan for 45 MW Windfarms around Gadag, Karnataka | NEPC-India Ltd, Chennai | 1997 | Executed |
69 | Performance survey of 13 windfarm in Tamil Nadu (Total 100 WEGs) | NEPC-Micon Limited, Chennai 'Development Ltd. Chennai | 1997 | Executed |
70 | Performance Review for improvement for 2 MW windfarm at Vadavalli, T.N. | Srinivasa Shipping & Property | 1997 | Executed |
71 | Performance Review & Improvement in Windfarm Revenue for 4 windfarms in T.N. | Winrock International (REPSO), Delhi | 1997 | Executed |
72 | Vetting of DPR & Evaluation of composite Tender for 3 MW windfarm project at Kadavakallu in Andhra Pradesh | Andhra Pradesh Windfarm 'Ltd. Hyderabad. | 1998 | Executed |
73 | Preparation of Detailed Project Report for 2 MW windfarm at Ramakkalamedu (Kuruvikkanam), Kerala | ANERT, Thiruvanthapuram | 1998 | Executed |
74 | Preparation of Detailed Project Report for 2 MW 'windfarm at Sogi Hills, Dist. Bellary, Karnataka | KREDL, Bangalore | 1998 | Executed |
75 | Preparation of Detailed Project Report for 9 MW & Supervision of 2MW windfarm at Malasamudra, Beladadi & Nagavi near Gadag, Karnataka | NEPC-India Ltd, Chennai | 1998 | Executed |
76 | Verification of Power Law Index in 4 different locations in India | Winrock International (REPSO), Delhi | 1998 | Executed |
77 | Supervision of 4 nos. 750 kW WEG tower foundation at Karungulam Dist. Tirunelveli (T.N.) | Asian Wind Turbines (P) Ltd. (AWT) Chennai. | 1999 | Executed |
78 | Supervision of construction,erection and commissioning for 3 MW windfarm at Karunakulam Dist.'Tirunelveli, T.N. | Dalmia Cement (Bharat)Ltd. | 1999 | Executed |
79 | Performance Review & Improvement in 10 WEGs of the windfarm. | M.P. Windfarms Ltd., Dewas | 1999 | Executed |
80 | Preparation of Detailed Project Report for 25MW 'windfarm at Nagda hills range (i.e. Kalapahar, Kadarkhow and Shankargarh near Dewas) | M.P. Windfarms Ltd., Dewas | 1999 | Executed |
81 | Preparation of Detailed Project Report for 2 MW 'windfarm at Devgarh, Rajasthan | REDA, Rajasthan | 1999 | Executed |
82 | Micro-siting of 2 WEGs at Lamba Gujarat | Elecon Engg. Co. Ltd. Gujarat | 2000 | Executed |
83 | Wind Resource Assessment & Master Plan forv 20 locations in various States in India. | Indian Institute of Tropical Meteorology, Bangalore | 2000 | Executed |
84 | Preparation of Tender Document & Evaluation for 5 MW Windfarm project at Dewas | M.P. Windfarms Ltd., Dewas | 2000 | Executed |
85 | Procurement Services for 5 MW Windfarm at Nagda Hill Dist. Dewas M.P. | M.P. Windfarms Ltd., Dewas | 2000 | Executed |
86 | Performance Evaluation & Improvement of 13 MW Windfarm at Jamgodrani Dist. Dewas M.P.(Ph-III) | M.P. Windfarms Ltd., Dewas | 2000 | Executed |
87 | Preparation of Detailed Project Report for 2 MW 'windfarm at Phalodi, Rajasthan | REDA, Rajasthan | 2000 | Executed |
88 | Identification of 2 sites (approx.25 MW each) near Jaisalmer & Phalodi in Rajasthan | Suzlon Energy Ltd, Ahmedabad | 2000 | Executed |
89 | Micro Survey of Wind Resource around 12 selected wind monitoring stations in India | Centre for Wind Energy Technology, Chennai | 2001 | Executed |
90 | Site visit & Brief Report for 3 MW Windfarm near Madanayakanhalli, Karnataka | Encon Services Ltd, Chennai | 2001 | Executed |
91 | Review of Performance of 7.5 MW Windfarm at Muppandal, T.N | Fenner (India) Ltd. Madurai, T.N. | 2001 | Executed |
92 | Detailed Project Report for 3.46 MW Windfarm At Jaisalmer, Rajasthan | Premium Ferro Alloys Ltd, Cochin Kerala | 2001 | Executed |
93 | Wind Power Density Maps at 70 m and estimation of Generation for Jaisalmer & Phalodi, Rajasthan | Suzlon Energy Ltd, Ahmedabad | 2001 | Executed |
94 | Preparation of WPD maps and selection of sites around Jaisalmer Wind Monitoring Station Rajasthan | Suzlon Energy Ltd, Ahmedabad | 2001 | Executed |
95 | Techno-Commercial Evaluation and Micrositing of 6 to 7 MW Windfarm at Sankaneri,Tamil Nadu | Amarjothi Spinning Mills Ltd Tamil Nadu | 2002 | Executed |
96 | DPR for 2 MW Windfarm at Mahuriya, M.P. (Civil & Elect.) | Centre for Wind Energy Technology 'Chennai | 2002 | Executed |
97 | DPR for 2 MW Windfarm at Mamatkheda,M.P. (Civil & Elect.) | Centre for Wind Energy Technology 'Chennai | 2002 | Executed |
98 | Micrositing of 6 Nos, 300 kW WEGs at Lamba | Elecon Engineering Co. Ltd Gujarat | 2002 | Executed |
99 | Techno-Commercial Evaluation of Bids for 4-5 MW Windfarm at Tamil Nadu | Gujarat Heavy Chemical 'Industries Ltd., Noida | 2002 | Executed |
100 | Performance Evaluation of Wind-Diesel System at Sagar Island, West Bengal | India-Canada Environment Facility (ICEF), New Delhi | 2002 | Executed |
101 | Preparation of DPR for 2 MW Windfarm at Mavinhunda, Distt. Belgaum, Karnataka | Karnataka Renewable Energy Development Ltd., Bangalore | 2002 | Executed |
102 | Financial Advisory Services - Petitions pertaining to Wind Power Projects in Maharashtra | Maharashtra Electricity Regulatory Commission (MERC), Mumbai | 2002 | Executed |
103 | Preparation of Sales Tax Incentive Policy for 'Wind Power Projects | Maharashtra Energy Development Agency,Pune | 2002 | Executed |
104 | Preparation of T.O.R for Wind Energy Mapping in Nepal | MSG Environmental Services New Delhi | 2002 | Executed |
105 | Performance study of 2.25 MW Windfarm at Devgarh,Rajasthan | NEG Micon (India) Pvt. Ltd. 'Chennai | 2002 | Executed |
106 | Preparation of DPR for 2 MW Demo. Windfarm at Narsimhakonda, Dist. Nellore, Andhra Pradesh | Non-conventional Energy Development Corpn. of Andhra Pradesh | 2002 | Executed |
107 | Estimation of generation at Akal and Sodha Sites near Jaisalmer, Rajasthan | NEG-Micon (India) Pvt. Ltd Chennai | 2002 | Executed |
108 | Identification of site for 35-40 MW windfarm Project | Amarjothi Spinning Mills Ltd Nambiyur, Tamil Nadu | 2003 | Executed |
109 | Micro Survey of Wind Resource around 10 selected wind monitoring stations in India | Centre for Wind Energy Technology, Chennai | 2003 | Executed |
110 | Identification of site and preparation of Detailed Feasibility Report for 1 MW Wind 'Power Project in Rajasthan | GAIL India Ltd. New Delhi | 2003 | Executed |
111 | Estimation of Annual Energy Generation at Mavinhunda & Sogi windfarm project sites. | Karnataka Renewable Energy Development Ltd Bangalore | 2003 | Executed |
112 | Marking of project are including approach road at Sogi & Mavinhunda demo. Project | Karnataka Renewable Energy Development Ltd Bangalore | 2003 | Executed |
113 | Tender Evaluation for 5 MW Demo/windfarm project at Jagmin (Chalkewadi), Dist. Satara | Maharashtra Energy Development Agency, Pune | 2003 | Executed |
114 | Carrying out contour survey : Jagmin wind power project | Maharashtra Energy Development Agency, Pune | 2003 | Executed |
115 | Carrying out Financial Analysis and preparation of Project/Tender documents for Inviting the proposals for setting up wind power projects of 20-25 MW capacity under Build, Operate and Transfer (BOT) basis | Maharashtra Energy Development Agency, Pune | 2003 | Executed |
116 | Selection of site for 2.24 MW Windfarm near Devgarh, Rajasthan and estimation of generation | NEG-Micon (India) Pvt. Ltd Chennai | 2003 | Executed |
117 | Performance Improvement 2.25 MW windfarm at Pratapgarh | NEG-Micon (India) Pvt. Ltd Chennai | 2003 | Executed |
118 | Identification of sites for installation of 10 Nos. wind monitoring masts in Rajasthan | NEG-Micon (India) Pvt. Ltd Chennai | 2003 | Executed |
119 | Selection of sites in Rajasthan at devgarh, Harshnath & Khodal | Suzlon Energy Ltd | 2003 | Executed |
120 | Collection of land details from Revenue/Forest Dept./Private parties for Windfarm project | Suzlon Energy Ltd Ahmedabad | 2003 | Executed |
121 | Identification of sites for installation of 10 Nos. wind monitoring masts in Rajasthan | Suzlon Energy Ltd Ahmedabad | 2003 | Executed |
122 | Site identification for installing 3 x 1.65 MW WEG at Sankaneri, Tamil Nadu | Amarjothi Spinning Mills Ltd Nambiyur | 2004 | Executed |
123 | Comments on Bid Documents for 500 MW Wind Power Projects in 5 States | BSES Limited, Mumbai | 2004 | Executed |
124 | Preparation of DPR for 2 x 50 kW Wind Diesel Project at Keating Point Car Nicobar, Andaman & Nicobar Islands | Centre for Wind Energy Technology, Chennai | 2004 | Executed |
125 | Micrositing of WEGs at Lamba W/Fsite,Gujarat | Elecon Engg. Co. Ltd, Gujarat | 2004 | Executed |
126 | Site identification for 5 MW Windfarm Project | Gujarat Heavy Chemicals Ltd Madurai | 2004 | Executed |
127 | Techno-Commercial Evaluation for 4 MW Windfarm in Tamil Nadu | Gujarat Heavy Chemicals Ltd 'Noida | 2004 | Executed |
128 | Preparation/Vetting of Purchase Order/Purchase Agreement, O&M Agreement, Micrositing at site and Supervision of Construction, Erection & Commissioning of 6 Nos. 600 kW WEG of Enercon at Sankaneri, Dist. Tirunelveli, Tamil Nadu | Gujarat Heavy Chemicals Ltd 'Noida | 2004 | Executed |
129 | Site identification for 100 MW each in 4 States and preparation of DFR for 100MW Windpower Project | Hindustan Petroleum Corpn. Ltd New Delhi | 2004 | Executed |
130 | Review & Submission of ITB for implementation of 100 MW Wind Power Project | Hindustan Petroleum Corpn. Ltd New Delhi | 2004 | Executed |
131 | Detailed Engineering Services for 12 MW Windfarm at Nagda Hill Dist. Dewas M.P. | M.P. Windfarms Ltd., Dewas | 2004 | Executed |
132 | Identification of site, Wind Monitoring and Preparation of Detailed Project Report for 50 MW W/F in Maharashtra | NEG-Micon (India) Pvt. 'Ltd., Chennai | 2004 | Executed |
133 | Micrositing and Supervision of construction, erection & Commissioning of 6 Nos. 800 kW WEG of Enercon at Poolavadi, Tamil Nadu | Gujarat Heavy Chemicals Ltd 'Noida | 2005 | Executed |
134 | Detailed Project Report for creation of basic infrastructure facilities required for setting up 25 - 40 'MW windfarm in Bagalkot,Koppal&Gadag Dists. | Karnataka Renewable Energy Development Limited, Bangalore | 2005 | Executed |
135 | Micrositing of 8 Nos. Suzlon make 1250 kW WEGs at Sankaneri, Tamil Nadu | Rasi Seeds (P) Limited Salem, Tamil Nadu | 2005 | Executed |
136 | Detailed Project Report for development of 5 MW Windfarm near Gadag, Karnataka | The Gadag Co-operative Inustrial Estate Ltd., Gadag, Karnataka | 2005 | Executed |
137 | Preparation of Pre-Feasibility Report for Wind Power Project at Bachelikhal, Uttaranchal | Titagarh Wagons Ltd Kolkata | 2005 | Executed |
138 | Preparation of Report on Technical Collaboration for Manufacture of Wind Electric Generators | Titagarh Wagons Ltd Kolkata | 2005 | Executed |
139 | Detailed study to verify, authenticate, modify the assumptions made by VEOL in respect of proposed installation of 70 MW W/F in the States of Tamil Nadu, Karnataka & Maharashtra | Vishal Exports Overseas Ltd Ahemedabad | 2005 | Executed |
140 | Preparation of Feasibility Report, biding document & evaluation and supervision of construction, erection and commissioning of 50 MW ONGC W/F in Gujarat | Oil & Natural Gas Corporation Ltd. Dehradun (Through MPWL) | 2005 | Executed |
141 | Supervision of construction, erection & commissioning of 15MW W/F at Nagda hill near Dewas | M.P. Windfarms Ltd., Bhopal | 2005 | Executed |
142 | Consultancy services for 12 MW windfarm at a suitable site in Maharashtra | Ahmednagar Municipal Corporation 'Ahmednagar | 2006 | Executed |
143 | Loss value calculation for shortage of wind mill generation | Amarjothi Spinning Mills Ltd Nambiyur | 2006 | Executed |
144 | Consultancy services for Establishment of Manufacturing base for Wind Turbines in India | Eagle Group, Surat | 2006 | Executed |
145 | Evaluation of Bids for 25MW Wind Power Project in the State of Maharashtra or Karnataka | Hindustan Petroleum Corpn. Ltd Mumbai | 2006 | Executed |
146 | Engineering Services for 250/500 MW Windfarm | Hindustan Zinc Ltd., Udaipur | 2006 | Executed |
147 | Engineering services for 50.4 MW Windfarm in Gujarat & 25.6 MW Wiundfarm in Maharashtra | Hindustan Zinc Ltd., Udaipur | 2006 | Executed |
148 | Installation &Training of WASP& WINDFARMER softwares at MANIT, Bhopal | Kanvas Enterprises, Bhopal | 2006 | Executed |
149 | Preparation of windfarm layout and generation assessment for 6 MW windfarm at Mavinhunda in Belgaum Dist. Karnataka | Karnataka Renewable Energy Development Limited, Bangalore | 2006 | Executed |
150 | Consultancy Services for 2.5 MW Windfarm in Maharashtra | Maharashtra Energy Development Agency, Pune | 2006 | Executed |
151 | Estimation of annual generation for 20MW W/F at Chakla nearDhule/Nandurbar in Maharashtra | MSPL Limited, Karnataka | 2006 | Executed |
152 | Survey work for development of Windfarm near Hospet | MSPL Limited, Karnataka | 2006 | Executed |
153 | Preparation of Detailed Project Report for 15 MW 'Windfarm at Nagda Hill Range, Dewas M.P. | M.P. Windfarms Ltd., Dewas | 2007 | Executed |
154 | Technical Evaluation of sites including generation Potential & Technical review of contracts related to transactions for the sites in Karnataka (25.6 MW) | DLF Limited New Delhi | 2007 | Executed |
155 | Technical Evaluation of sites including generation Potential & Technical review of contracts related to transactions for the site in Gujarat (150 MW) | DLF Limited New Delhi | 2007 | Executed |
156 | Energy Estimation at NEG-Micon Offered sites near Tirunelveli in Tamil Nadu (36 MW) | GMR Energy Limited Bangalore | 2007 | Executed |
157 | Energy Estimation at Suzlon Offered sites near Coimbatore in Tamil Nadu (47 MW) | GMR Energy Limited Bangalore | 2007 | Executed |
158 | Carrying out Technical Due-Diligence of 48 x 250 kW WEGs in Coimbatore District, Tamil Nadu | Gujarat Fluorochemicals Limited, Vadodara | 2007 | Executed |
159 | Supervision of Construction, Erection & Commissioning of 3 Nos. of 1650 kW WEGs at Timmappan Gudda, Dist. Belgaum, Karnataka | Magma Leasing Limited Kolkata | 2007 | Executed |
160 | Energy Estimation for Vestas 1650kW WEGs (6.6 MW) at Vandhiya, Gujarat | Magma Leasing Limited Kolkata | 2007 | Executed |
161 | Energy Estimation of 3 Nos. of 1650 kW WEGs at Timmappangudda, Dist,. Belgaum, Karnataka (5 MW) | Magma Leasing Limited Kolkota | 2007 | Executed |
162 | Technical Analysis of C-WET Wind Turbine Test Report for NEG-Micon 950 kW power curve measurement IEC 61400-12 & C-WET report for MSPL on study and evaluation of 29.75 MW Wind power project at GR Halli, Chitradurga, Karnataka | MSPL Limited Hospet, Karnataka | 2007 | Executed |
163 | Generation Estimate of 30 MW Windfarm at Surajbari in Gujarat | MSPL Limited Hospet, Karnataka | 2007 | Executed |
164 | Energy Estimation for Vestas 600 kW machines (26.4 MW) at Sunnadahalli, Karnataka | MSPL Limited Hospet, Karnataka | 2007 | Executed |
165 | Analysis of Wind data and Assessment of generation output for MSPL Windparks at Sogi & Jajikalgudda (115 MW) | MSPL Limited output for MSPL Windparks at Sogi & Jajikalgudda Hospet, Karnataka | 2007 | Executed |
166 | Techno-Commercial Evaluation of VENSYS V-77 WEGs | Vetco Enterprises Ltd 'Chennai | 2007 | Executed |
167 | Technical Evaluation of new sites including generation Potential & Technical review of contracts related to transactions for the sites in Gujarat & Karnataka (240.10 MW) | DLF Limited New Delhi | 2007 | Executed |
168 | Turnkey Consultancy Services for Setting up of 10 MW Windfarm of GSFC at Bayath District Kutch in Gujarat | Gujarat State Fertilizers & Chemicals Ltd., Gujarat | 2007 | Executed |
169 | Installation of wind masts,collection of wind data and analysis of the wind data (30 MW) | MSPL Limited Hospet, Karnataka | 2007 | Executed |
170 | Consultancy for carrying out the contour survey and workout micrositing of Windfarm at Satara in Maharashtra | Atlanta Power Project Pvt Ltd, Mumbai | 2008 | Executed |
171 | Technical Evaluation of sites including generation Potential & Technical review of contracts related to transactions for the site in Tamil Nadu (37.6 MW) | DLF Limited New Delhi | 2008 | Executed |
172 | Detailed Project Report (DPR) for 4.8 MW Wind Power Project at Village Bargaon/Khamla, Near Kukru, Tehsil Bhainsdehi District Betul | Marut-Shakti Energy India Ltd | 2008 | Executed |
173 | Detailed Project Report (DPR) for 4.8 MW Wind Power Project at Village Dhar, Near Kukru, Tehsil Bhainsdehi District Betul | M.P.Windfarms Limited | 2008 | Executed |
174 | Supervision of construction, erection & commissioning of 150 MW W/F in Dist. Kachchh, Gujarat | DLF Limited New Delhi | 2008 | Executed |
175 | Supervision of construction, erection & commissioning of 25.6 MW W/F in Dist. Gadag, Karnataka | DLF Limited New Delhi | 2008 | Executed |
176 | Preparation fo the feasibility report for the development of wind park at Barmer 60-70 MW & Ratnagiri - 25-30 MW | JSW Energy Limited, Mumbai | 2008 | Executed |
177 | Energy Estimation for Vestas 600 kW machines for the site at Harihar in Karnataka | MSPL Limited Hospet, Karnataka | 2008 | Executed |
178 | Wind resource Assessment study at Basavana Bagewadi, Bijapur Distt and Haveri Distt. In Karnataka State | Poorva Powergenco Ltd Bangalore | 2008 | Executed |
179 | Availing Lender's Engineering services for RS India Wind Energy Pvt LTd's 99.45 MW Wind based power project in Satara, Maharashtra | Power Finance Corporation Ltd., New Delhi | 2008 | Executed |
180 | Consultancy for Evaluation and Suggestion for Improvement and Performance of 6x600 KW Enercon Machine for GHCL Wind Mill Phase - I, Muppandal (3.6 MW) | GHCL Limited, Unit Shree Minakshi Mills, Paravai, Samayanallur (P.O.) Madurai | 2008 | Executed |
181 | Study of performance of Generation of 1.25 MW WEG installed in Dhule District, Maharashtra | Magma Shrachi Finance Ltd., Magma House, 24, Park Street, Kolkata | 2008 | Executed |
182 | Technical Evaluation of sites including generation potential and technical review of the draft of the contracts to be entered into with the suppliers / contractors for new windfarm to be set up for the site Sinnar in Nasik District State of Maharashtra (51MW) | DLF Limited New Delhi | 2008 | Executed |
183 | Feasibility Report for the windfarm at Pholodi Site, Distt. Jodhpur, Rajasthan (4.95MW) | Ishwar Power Corp. Pvt. Ltd, New Delhi | 2008 | Executed |
184 | Verification of Power Curve based Guaranteed Generation for 150 MW Windfarm in Gujarat | DLF Limited New Delhi | 2008 | Executed |
185 | Micrositing for 50 MW Windfarm Project at Jogimatti, Karnataka | Poorva Powergenco Ltd Bangalore | 2008 | Executed |
186 | Wind Energy Estimation of 5 MW windfarm at Tivari Site of Jodhpur Distt. Rajasthan | Magma Shrachi Finance Ltd., Magma House, 24, Park Street, Kolkata | 2008 | Executed |
187 | Technical Evaluation of sites including generation potential and technical review of the draft of the contracts to be entered into with the suppliers / contractors for new windfarm to be set up for the site Panapatti & Elevanthy in Tamil Nadu (34.5 mw) | DLF Limited New Delhi | 2008 | Executed |
188 | Technical Evaluation of sites including generation potential and technical review of the draft of the contracts to be entered into with the suppliers / contractors for new windfarm to be set up for the site Ratan Ka Bas & Osiyan in Rajasthan (60 MW) | DLF Limited New Delhi | 2008 | Executed |
189 | Generation Estimation of Enercon Make 13 Nos x 800 kW WEGs at Tivari site, Distt. Jodhpur, in Rajasthan (10.4 MW) | MSPL Limited Wind Mill Division, Karnataka | 2008 | Executed |
190 | Feasibility Report for Setting up Wind Power Project at Village Vayor, Taluka Abdasa, Distt. Kutchh, Gujarat (50 MW) | Jaiprakash Associates Ltd., JA House, 63, Basant Lok, Vasant Vihar, New Delhi | 2008 | Executed |
191 | Supervision of Construction, Erection & Commissioning of 4 MW (5 WEGs x 800 kW rating of Enercon make) windfarm at Tivari Site of Jodhpur Distt. Rajasthan | Magma Shrachi Finance Ltd., Magma House, 24, Park Street, Kolkata | 2008 | Executed |
192 | Mandate for 24 MW Windfarm at Rahasta near Deverkulam in Tamil Nadu | Green Infra Limited, Sector-33, plot No.19, Gurgaon | 2008 | Executed |
193 | Wind data collection for one year at Banakatti, Basarkatti & Almatti site and submission of analysis report on half yearly and yearly basis | MSPL Limited Wind Mill Division, Karnataka | 2008 | Executed |
194 | Detailed Project Report for Development of 6 MW Windfarm near Khandake, Baradari, Tal. Dist. Ahmadnagar (Maharashtra). | Dyaneshwar Energy Pvt. Ltd, Ahmadnagar | 2008 | Executed |
195 | RETA 6392 – TA for Supporting the Implementation of the Energy Efficiency Initiative in DMCs.(500 MW) | Asian Development Bank, Manila, Philippines | 2008 | Executed |
196 | Detailed Project Report for Development of 16.25 MW Wind Power Project at Jogimatti Hills, Near Chitradurga, Karnataka | Poorva Powergenco Ltd Bangalore | 2008 | Executed |
197 | Generation Estimation of three sites of Bagalkot District (Basarikatti, Banakatti & Almatti ) (10.4 MW) | MSPL Limited Wind Mill Division, Karnataka | 2008 | Executed |
198 | Verification of Power Curve based Guaranteed Generation for 54 MW Windfarm in Rajasthan | DLF Home Developers Limted, Gurgaon | 2008 | Executed |
199 | Verification of Power Curve based Guaranteed Generation for 34.5 MW Windfarm in Tamil Nadu | DLF Home Developers Limted, Gurgaon | 2008 | Executed |
200 | Detailed Project Report (DPR) for 6 MW Wind Power Project at Sogi site in Bellary District in Karnataka | Karnataka Renewable Energy Development Limited, Bangalore | 2009 | Executed |
201 | Detailed Project Report (DPR) for 6 MW Wind Power Project at Mavinhunda site in Belgaum District, Karnataka | Karnataka Renewable Energy Development Limited, Bangalore | 2009 | Executed |
202 | Wind resource assessment and independent validation of Production Estimate for wind power projects in Tamilnadu and Karnataka (35 MW) | KSK Energy Ventures Limited, Hyderabad | 2009 | Executed |
203 | Pre-feasibility towards the 60 MW Wind Power Project near Ranebennur, Haveri District Karnataka duly indicating the WASP analysis, Potential of the site, Energy Estimation for 3 types of WEGs and a preliminary financial analysis | Abletech Electro Engineers (P) Ltd., Bangalore | 2009 | Executed |
204 | Wind Data Analysis and production estimate for 50 MW Wind Power Project in Gujarat. (Windfarm site at Vandhiya, Jakhau & Maliya Miyana) | Gujarat State Petroleum Corporation Ltd, Gandhinagar | 2009 | Executed |
205 | Energy Estimation for 100 MW Wind Power Project in Tamil Nadu - Technical Evaluation | Jindal Steel Power Ltd., Noida | 2009 | Executed |
206 | Probability calculation for Generation estimates corresponding to DLF 4 sites of Windfarm located in Gujarat (3 sites) and Karnataka (1 site). | DLF Limited New Delhi | 2009 | Executed |
207 | Probability calculation for Generation estimates corresponding to DLF 3 sites of Windfarm located in Rajasthan (2 sites) and Tamil Nadu (1 site). | DLF Home Developers Limted, Gurgaon | 2009 | Executed |
208 | Owner's Engineer/PMC for supervision & Inspection of construction, erection and commissioning activities of GSPC's 52.5 MW capacity Wind Power Project in District Kutchh, Gujarat | Gujarat State Petroleum Corporation Ltd, Gandhinagar | 2009 | Executed |
209 | Feasibility Study for installation of two Wind Solar Hybrid Power System at Mussorie in Uttaranchal for ONGC. | Oil & Natural Gas Corporation Ltd. Dehradun (Through MPWL) | 2009 | Executed |
210 | Feasibility Study for installation of two Wind Solar Hybrid Power System at Betul inGoa for ONGC. | Oil & Natural Gas Corporation Ltd. Dehradun (Through MPWL) | 2009 | Executed |
211 | Technical Coordination and Site visit with Mr. Garrad Hassan for Assessment of wind farms / Generation Potential Forecast at Karnataka, Tamil Nadu, Gujarat and Rajasthan. | DLF Limited New Delhi | 2009 | Executed |
212 | Transaction Advisory Services – Design, Construction, Finance, Operation &Maintenance of 25-40 MW Wind Park at Bigara, Mauritius | CRISIL Infrastructure Advisory, New Delhi | 2009 | Executed |
213 | Consultancy Services for Wind Power Project - Selection of 4 suitable locations of WEGs | Agro Solvent products Pvt. Ltd, Gwalior | 2009 | Executed |
214 | Consultancy Services for Wind Power Project -Guidelines on contract drafting to the Supplier | Agro Solvent products Pvt. Ltd, Gwalior | 2009 | Executed |
215 | Performance Study of 2 Nos Suzlon make 1250 kW WEGs in Dhule District, Maharashtra (2.5 MW) | Sri Anjaneya Cotton Mills Limited, Davangera, Karnataka | 2009 | Executed |
216 | Performance Study of 2 Nos Suzlon make 1250 kW WEGs in Dhule District, Maharashtra (2.5 MW) | GEM Laboratories Pvt. Ltd.Davangera, Karnataka | 2009 | Executed |
217 | Consultancy Services for RCF's 25 MW Wind Power Project in Maharashtra (Techno-Commercial evaluation of Bids, Assessment of wind mast data & Micrositing, Study of power evacuation, preparation of bankable DFR) | Rashtriya Chemicals & Fertilizers Ltd., Mumbai | 2009 | Executed |
218 | Technical Due Diligence of 16.5 MW Windfarm comprising 10 Nos VESTAS 1650 kW WEGs AT Surajbari, Dist. Kachchh in Gujarat | SkyZen Infrabuild Pvt Ltd, Mumbai | 2009 | Executed |
219 | Preliminary Study for REPOWERING of Demonstration Windfarm in Tamil Nadu & Gujarat. (Kayathar, Kethanur, Muppandal, Dhank & Okhamadhi) for 20.6 MW | Indian Renewable Energy Development Agency Ltd. (IREDA) (Through MPWL) | 2009 | Executed |
220 | Selection of 5 Suitable locations of WEGs offered by ENERCON At Ugawa, Dist. Jaisalmer, Rajasthan (4 MW) | Sterling Agro Industries Ltd., New Delhi | 2009 | Executed |
221 | Establishment of 12 MW Wind Power Project in Gujarat - Preparation of TEFR, NIT, Bid Analysis & Recommendation, Draft Orders & Supervision service during Instalaltion &, commissioning of WEG | Krishak Bharati Cooperative Ltd., Surat, Gujarat | 2009 | Executed |
222 | Consultancy Services for 100 – 150 MW Wind Power Project in India - (Procurement Services - Preparation of NIT & BID document, Techno-Commercial evaluation of bids & Finalization of contracts & orders agreement) | SBI Capital Markets Limited, 'Mumbai – 400 005 | 2009 | Executed |
223 | Preparation of Detailed Project Report for submition to MPUVN and preparation of Bankable DPR to submition to Financial Institutions - 49.5 MW | Betul Wind Farms Limited, Gurgaon | 2009 | Executed |
224 | Energy Estimation of 38 x 800kW WTGs of Enercon Windfarm sites at Chavaneshwar at, Satara in Maharashtra &, V Kulam & Manur at Tirunelveli in Tamil Nadu | Paharpur Cooling Towers Limited | 2009 | Executed |
225 | Reassessment of Generation from 14 Nos Enercon 800 kW WTGs at Ratedi, Dewas, MP. | K.S. Oil Limited | 2009 | Executed |
226 | Energy estimation of 6 MW Wind Power Project at Kundur site in Karnataka | PTC India Financial Services Limited, New Delhi | 2009 | Executed |
227 | Energy Estimation and selection of best 5 nos. Gamesa make WEGs near Theni Windfarm site Dist. Theni, in Tamil-Nadu. | Amarjothi Spinning Mills Ltd Erode Dt.Tamil Nadu |
2010 | Executed |
228 | Energy Estimation for 10x800 kW Enercon make machine at Tiwari site in Rajasthan | K.S. Oil Limited, New Delhi | 2010 | Executed |
229 | Owner's Engineer/PMC for GSPL's Windfarm in Gujarat ( 27 WEGs of 1500 kW Suzlon make (40.50 MW) at Maliya Miyana site) | Gujarat State Petronet Ltd, 'Gandhinagar |
2010 | Executed |
230 | Owner's Engineer/PMC for GSPL's Windfarm in Gujarat ( 8 WEGs of 1500 kW Suzlon make (12 MW) at Gorsar site) | Gujarat State Petronet Ltd, 'Gandhinagar |
2010 | Executed |
231 | supervision during construction, erection and commissioning of SBI's Wind Power Project of 1.5 MW in Gujarat. | SBI Capital Markets Limited, 'Mumbai – 400 005 | 2010 | Executed |
232 | supervision during construction, erection and commissioning of SBI's Wind Power Project of 9 MW in Maharashtra. | SBI Capital Markets Limited, 'Mumbai – 400 005 | 2010 | Executed |
233 | supervision during construction, erection and commissioning of SBI's Wind Power Project of 4.5 MW in Tamil Nadu | SBI Capital Markets Limited, 'Mumbai – 400 005 | 2010 | Executed |
234 | Technical Feasibility study of the windfarm at Putlur (Tadpatri) windfarm site in Ananthapur district, Andhra Pradesh - 95 MW | Bharath Wind farm Limited, Chennai |
2010 | Executed |
235 | Energy Estimation of Suzlon 2x1.5MW capacity WEG at Akal site in Rajasthan | Sterling Agro Industries Ltd., New Delhi | 2010 | Executed |
236 | Energy Estimation of 25.5 MW windfarm at “Muthinpatti” site in Tamil Nadu | Suzlon Energy Limited, Pune, Maharashtra. |
2010 | Executed |
237 | Energy Estimation of 1 x 1500 kW Suzlon make machine in Tirunelveli District in Tamil Nadu | Deccan Cements Limited, Hyderabad | 2010 | Executed |
238 | Energy Estimation of 2x1.5 MW (3 MW) wind energy projects at Kasturirengapuram Vilalge, Tirunelveli district, Tamil Nadu | Dhanalakshmi Cotton & Rice Mills Pvt. Ltd, Guntur district, AP | 2010 | Executed |
239 | Energy Estimation of 2x1.5 MW machine each at Echanda & Balapathinaramapuram Village, Tirunelveli district, TN | Idupulapadu Cotton Mills Limited, Guntur district, AP | 2010 | Executed |
240 | Power Curve Testing of GSPC 52.5 MW Wind Power Project at Jakhau site in Kutch district, Gujarat | Gujarat State Petroleum Corporation Ltd. Gandhinagar | 2010 | Executed |
241 | Wind Potential Study for Repowering of an existing 8.1 MW windfarm site at Varapatti/Sultanpet in Coimbatore district in Tamil Nadu | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
242 | Techno-Commerical Evaluation of Offer made by Suzlon for 25.2 MW WPP comprising 12x2100 kW WEGs at Jaibhim site near Nizampur in Dhule district, Maharashtra and Scrutiny of orders to be placed | Serum Institute of India Ltd, Pune | 2010 | Executed |
243 | Energy Estimation of 10.5 MW Windfarm consisting of 1x1.5 MW Suzlon WEGs at Kundram and Panapatti in Tamil Nadu | Rohit Surfactants Pvt. Ltd, Kanpur | 2010 | Executed |
244 | Assessment of estimated generation of 21x600 kW (12.6 MW) WEG of Suzlon make at Palsodi site district Ratlam in Madhya Pradesh | Jagdamba Power and Alloys Ltd., Raipur | 2010 | Executed |
245 | Assessment of estimated generation of 14 x 1500 kW (21 MW) WEG of Suzlon make at Minchiri site district Bellary, in Karnataka | Jagdamba Power and Alloys Ltd., Raipur | 2010 | Executed |
246 | Assessment of estimated generation of 16 x 1500 kW (24 MW) WEG of Suzlon make at Mahuriya site district Shajapur in Madhya Pradesh | Jagdamba Power and Alloys Ltd., Raipur | 2010 | Executed |
247 | Independent energy estimation of 20 MW windfarm comprising 25 nos. Enercon make 800 kW WEGs at Silpa in Jaisalmer dist., Rajasthan |
DCW Limited (DCWL), Mumbai | 2010 | Executed |
248 | Marking the location on toposheet for applying to Sri-Lankan Government for installation of wind monitoring masts for the Wind Resource Assessment at Sri Lanka | ha | 2010 | Executed |
249 | Due Diligence of 2 nos. Enercon make 800kW WEGs at Kita in Jaisalmer district, Rajasthan | GeeCee Ventures Limited, (Formerly: Gwalior Chemicals Industries Limited), Mumbai |
2010 | Executed |
250 | Due Diligence of 3 Nos. Suzlon make 1250 kW WEGs at Akal in Jaisalmer District, Rajasthan | GeeCee Ventures Limited, Mumbai |
2010 | Executed |
251 | Independent Energy Estimation of Vestas 10 nos 1800 kW WEGs at Surajbari, dist. Kachchh, Gujarat |
Surajbari WindFarm Development Pvt.Ltd, Mumbai | 2010 | Executed |
252 | Evaluation of Bid as well as carrying out the due dilligence of the 10 MW Suzlon's 5x2.1MW Wind Power Projectin Tamil Nadu | Ramky Enviro Engineers Ltd, Hyderabad | 2010 | Executed |
253 | Evaluation of Bid as well as carrying out the due dilligences of the 18 MW comprising Vestas's 10x1.8 MW Wind Power Project at Gujarat | Ramky Enviro Engineers Ltd, Hyderabad | 2010 | Executed |
254 | Pre-Feasibility Study of 5 sites in Karnataka | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
255 | Preliminary assement, Detailed study and marking exact location of Mast at Hasan in Karnataka. | SkyZen Infrabuild Pvt Ltd, Mumbai | 2010 | Executed |
256 | Development Phase activities of Wind Power Project at Tamil Nadu (25 MW) | Tanjog Holding, Malaysia | 2010 | Executed |
257 | Development Phase activities of Wind Power Project at Karnataka (10 MW) | Tanjog Holding, Malaysia | 2010 | Executed |
258 | Consultancy Services for Assessment of Investment Climate for Wind Power Development in India | IREDA, New Delhi | 2010 | Executed |
259 | Due Diligence of 5x1.65 MW Machine at Revangaon in Maharashtra (8.25 MW) | SkyZen Infrabuild Pvt Ltd, Mumbai | 2010 | Executed |
260 | Detailed Project Report (DPR) at Hunchi Benchi site in Karnataka | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
261 | Detailed Proejct Report (DPR) at Haveri site in Karnataka | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
262 | Detailed Project Report (DPR) at Talaricheru site in Andhra Pradesh. | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
263 | Detailed Project Report (DPR) at Tirumalayapalli site in Andhra Pradesh. | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
264 | Detailed Project Report (DPR) at Payalkuntla site in Andhra Pradesh. | KSK Energy Ventures Limited, Hyderabad | 2010 | Executed |
265 | Technical Evaluation (Due Diligence) 97 Nos. V-100 Machines in Maharashtra (175 MW) | SkyZen Infrabuild Pvt Ltd, Mumbai | 2010 | Executed |
266 | Opinion Report for Layout of 100 MW Windfarm Near Villagew Jaora (Mamatkheda), District Ratlam (M.P.) | D.J. Energy Limited, Ratlam | 2010 | Executed |
267 | Post Commissioning Monitoring of 52.5 MW Wind Power Project in Gujarat | Gujarat State Petroleum Corporation Limited | 2010 | Executed |
268 | Energy Estimation 6.3 MW Windfarm consisting of 3x2.1 MW Suzlon WTGs at Project site in Tejuva site at Rajasthan. | Paharpur Cooling Towers Limited | 2010 | Executed |
269 | Preparation of Detailed Feasibility Report for Wind Power Project at Tirumala site, Andhra Pradesh. | Green Energy Solutions, Hyderabad | 2011 | Executed |
270 | Independent energy estimation of Windfarm of 10.5 MW Capacity Suzlon S-88 Machines at Herada in the State of Karnataka. |
Shree Jagdamba Energy LLP, Raipur | 2011 | Executed |
271 | Micrositing/Energy Estimation for 15 MW Windfarm in Belgaum District, Karnataka | MSPL Limited | 2011 | Executed |
272 | Preparation of Detailed Project Report at Somandapalli site in Andhra Pradesh | KSK Energy Ventures Limited, Hyderabad | 2011 | Executed |
273 | Preparation of Wind Resource Map for N-E States Including Sikkim and Ladakh region covering Leh and Kargil under Small Wind Energy & Hybrid Systems Programme 2010-11 | Ministry of New & Renewable Energy, New Delhi. | 2011 | Executed |
274 | Re-powering of Windfarm located at Kayathar-Tamil Nadu. | Arissan Power Limited, Kolkata | 2011 | Executed |
275 | Preparation of Detailed Feasibility Report for Windfarm at Village Bhanvaj, Taluka Khalapur,District Raigad, Maharashtra. | Hindustan Electricity Generation Company Pvt. Ltd. | 2011 | Executed |
276 | Identification of Potential Area and Micrositing for 50 MW Wind Power Project in Orissa. | KSK Energy Ventures Limited, Hyderabad | 2011 | Executed |
277 | Detailed Project Report for 15.2 MW Wind Power Project near Hospet, Karnataka | MSPL Limited | 2011 | Executed |
278 | Re-powering of existing Wind Power Projects at Muppandal & Karungulam in Tamil Nadu | Dalmia Bharat Sugar and Industries Limited | 2011 | Executed |
279 | Independent Energy Estimation of windfarm of 14 MW capacity at Thosegar in the State of Maharashtra. | ReNew Power Pvt. Ltd.,Mumbai | 2011 | Executed |
280 | Independent Energy Estimation of 25 MW capacity Windfarm at Vhaspet in the State of Maharashtra. | WinWind Power Energy Pvt. Ltd., Chennai | 2011 | Executed |
281 | Wind Resource Assessment at Navlakh Umbre, near Talegaon, Dist. Pune in Maharashtra | Hiranandani Renewable Energy Pvt. Ltd., Mumbai | 2011 | Executed |
282 | Independent Energy Estimation of 42 MW windfarm capacity consisting of 28x1500 kW Machines in the State of Tamil Nadu. | Green Infra Limited, New Delhi | 2011 | Executed |
283 | Independent Energy Estimation of 18 MW capacity consisting of 12x1500 kW Machines in the State of Maharashtra. | Green Infra Limited, New Delhi | 2011 | Executed |
284 | Independent Energy Estimation of 31.5 MW capacity consisting of 15x2100 kW Machines in the State of Karnataka. | Green Infra Limited, New Delhi | 2011 | Executed |
285 | Wind Resource Assessment at Vadgaon Range, District. Pune in Maharashtra | Hiranandani Renewable Energy Pvt. Ltd., Mumbai | 2011 | Executed |
286 | Independent Energy Estimation of 30 MW windfarm capacity consisting of 15x2.00 MW Kenersys Machines in the State of Tamil Nadu. | Green Infra Limited, New Delhi | 2011 | Executed |
287 | Due Diligence/Independent Energy Estimation of 28 MW Capacity at Ayyanathuru in Tirunelveli District, Tamil Nadu. | Ramky Enviro Engineers Ltd, Hyderabad | 2011 | Executed |
288 | Preparation of Revised DPR for 6 MW Wind Power Project at Mavinahunda in Raybagh Taluk of Belgaum District | Karnataka Renewable Energy Development Ltd.,, Bangalore | 2011 | Executed |
289 | Independent Performance Assessment/Energy Estimation of 4 MW Windfarm Capacity at Pusupathur of Dindigul District in the State of Tamil Nadu. | K.S. Oil Limited, New Delhi | 2011 | Executed |
290 | Preparation of Detailed Project Report (DPR) for 100.8 MW Wind Power Project in Andhra Pradesh. | Rayala Wind Pvt. Ltd.(Greenko) | 2011 | Executed |
291 | Preparation of Detailed Project Report (DPR) for 128 MW Wind Power Project in Karnataka. | Fortune Five Hydel Projects Pvt. Ltd.(Greenko) | 2011 | Executed |
292 | Independent Energy Estimation of Windfarm of 18 MW Capacity in the State of Gujarat. | Graphite India Ltd. | 2011 | Executed |
293 | Independent Energy Estimation of 123.2 MW Windfarm in Gujarat and Karnataka | Hindustan Zinc Ltd | 2011 | Executed |
294 | Pre-feasibility Study for 15 MW Wind Power Project in Madhya Pradesh | Moser Baer Ltd. | 2011 | Executed |
295 | Independent Energy Estimation of Windfarm of 15 MW Capacity in the State of Rajasthan | Green Infra Limited, New Delhi | 2011 | Executed |
296 | Detailed Project Report for 49.5 MW Wind Power Project at Rasingapura in the State of Tamil Nadu | Green Infra Limited, New Delhi | 2011 | Executed |
297 | Detailed Project Report for 18 MW Wind Power Project at Gude in the State of Maharashtra | Green Infra Limited, New Delhi | 2011 | Executed |
298 | Independent Energy Estimation/Micrositing of 35-40 MW capacity Wind Power Project in the State of Karnataka | Green Infra Limited, New Delhi | 2011 | Executed |
299 | Detailed Project Report for 35-40 MW capacity Wind Power Project in the State of Karnataka | Green Infra Limited, New Delhi | 2011 | Executed |
300 | Detailed Project Report for 18 MW capacity Wind Power Project in the State of Rajasthan. | Green Infra Limited, New Delhi | 2011 | Executed |
301 | Assistance for Preparation of Specific Chapters for DPR on “Livelihood Solutions” through Integrated Renewable Energy | Towards Action and Learning (TAAL) | 2011 | Executed |
302 | Independent Energy Estimation of 9 MW Capacity Windfarm comprising 15 Nos. of 600 kW Suzlon Machines at Sailana, District Ratlam in the State of Madhya Pradesh. | M/s Rohit Surfactants Limited, Kanpur | 2011 | Executed |
303 | Independent Performance Assessment/Energy Estimation of 16 MW Windfarm Capacity at Rathedi Hills of Dewas District in the State of Madhya Pradesh. | K.S. Oil Limited, New Delhi | 2011 | Executed |
304 | Feasibility study for identification of Wind Power Project installation in Maharashtra. | Warburg Pincus India Pvt. Ltd., Mumbai | 2011 | Executed |
305 | Feasibility study for identification of 43 MW Wind Power Project installation at Kuppam in Andhra Pradesh | Warburg Pincus India Pvt. Ltd., Mumbai | 2011 | Executed |
306 | Feasibility study for identification of 61 MW Wind Power Project installation at Puttaparthi in Andhra Pradesh | Warburg Pincus India Pvt. Ltd., Mumbai | 2011 | Executed |
307 | Consultancy services for preparation of bidding document for 12 MW wind power project at Deogad, District Sindhudurg. | MSEDCL, Mumbai | 2011 | Executed |
308 | Estimation of wind power potential and preparation of detailed Micro siting map for Wind Power Project site at Nallakonda, Anantapur Distt, Andhra Pradesh | NEDCAP, Hyderabad | 2011 | Executed |
309 | Techno-Commercial Evaluation of Suzlon's offer for 18.90 MW Wind Power Project in Gujarat. | Gujarat State Petroleum Corporation Limited | 2011 | Executed |
310 | Energy Estimation of 34x800 kW Enercon WTGs at Project site in Gujarat and Tamil Nadu. | Paharpur Cooling Towers Limited | 2011 | Executed |
311 | Independent Energy Estimation of 9 MW Capacity Windfarm in the State of Rajasthan. | RSPL Limited, Kanpur | 2012 | Executed |
312 | Verification & Certification for Power Generation Loss for GSFC's 33 MW Wind Power Project at site Jamanwada, District Kutch | Gujarat State Fertilizers & Chemicals Ltd., Gujarat | 2012 | Executed |
313 | Independent Energy Estimation for 9 MW Wind Power Project comprising 6 Nos. of Suzlon make 1500 kW WEGs at Akal District, Jaisalmer, Rajasthan | GI Wind Power Co. Ltd. | 2012 | Executed |
314 | Estimation of wind power potential and preparation of detailed Micro siting map for Wind Power Project site at Borampalli, Anantapur Distt, Andhra Pradesh | NEDCAP, Hyderabad | 2012 | Executed |
315 | Independent Energy Estimation of 63 MW Wind Power Project considering Vensys 87 Regen make in the State of Karnataka. | Green Infra Limited | 2012 | Executed |
316 | Project Management of 18.90 MW Wind Power Project in Jamanwada, District Bhuj, Gujarat. | Gujarat State Petroleum Corporation Limited | 2012 | Executed |
317 | Performance Monitoring of 18.90 MW Wind Power Project in Jamanwada, District Bhuj, Gujarat. | Gujarat State Petroleum Corporation Limited | 2012 | Executed |
318 | Supervision during commisisoning of Wind Mast, Data Collection, Analysis of Wind Mast Services and Validation/authentication of wind mast data from C-WET at Vadagaon Range, Tal. Mulshil, Pune, Maharashtra. | Hindustan Electricity Generation Company Pvt. Ltd. | 2012 | Executed |
319 | Independent Energy Estimation of Windfarm of 45 MW Capacity comprising Regen Vensys Machine at Dalot in the State of Rajasthan. | Green Infra Limited | 2012 | Executed |
320 | Preparation of Detailed Project Report for 45 MW Capacity comprising Regen Vensys Machine at Dalot in the State of Rajasthan. | Green Infra Limited | 2012 | Executed |
321 | Independent Energy Estimation of 2 MW Capacity at Jamb Amberi & Vaspeth | Juniper Hotels Pvt. Ltd. | 2012 | Executed |
322 | Independent Energy Estimation of 9 MW Capacity Wind Power Project at Akal in the State of Rajasthan. | RSPL Limited, Kanpur | 2012 | Executed |
323 | Preparation of Wind Maps and Feasibility Report of four sites in Bangladesh. | Regen Powertech Pvt. Ltd. | 2012 | Executed |
324 | Estimation of Wind Potential and Preparation of Detailed Project Report (DPR) for proposed 100 MW (approx.) Windfarm in Gokak, Belgaum District of Karnataka. | Shapoorji Pallonji Power Projects Pvt. Ltd. | 2012 | Executed |
325 | Comparative Energy Generation at Dalot site, Rajasthan. | Regen Powertech Pvt. Ltd., Chennai. | 2012 | Executed |
326 | Comparative Energy Generation at Rasingapuram site, Tamil Nadu. | Regen Powertech Pvt. Ltd., Chennai. | 2012 | Executed |
327 | Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project site at Siddannagatta, Kurnool District, Andhra Pradesh | New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad | 2012 | Executed |
328 | Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project site at pampanoortanda, Anantpur District, Andhra Pradesh | New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad | 2012 | Executed |
329 | Wind Resource Assessment Report and Map for District of Dhar and Raisen in Madhya Pradesh. | The Energy and Resources Institute, New Delhi | 2012 | Executed |
330 | Estimation of Energy Yield of 31.5 MW Wind Power Project in Maharashtra. | Moser Baer Clean Energy Ltd. | 2012 | Executed |
331 | Independent Energy Estimation of 44 MW Wind Power Project in Satara District of Maharashtra. | Kenersys India Pvt. Ltd. | 2012 | Executed |
332 | Preparation of Feasibility Report for Proposed Wind Power Project in Gujarat | Gujarat Industries Power Company Ltd. | 2012 | Executed |
333 | Independent Energy Estimation of 10 MW Wind Power Project in Sangli District of Maharashtra. | Kenersys India Pvt. Ltd. | 2012 | Executed |
334 | Power Performance Test of 18.9 MW Windfarm at Jamanvada, District Kutchh in Gujarat | Gujarat State Petroleum Corporation Limited | 2012 | Executed |
335 | Yield Assessment of 44.8 MW Wind Power Project in Bijapur District, Karnataka. | Moser Baer Clean Energy Limited | 2012 | Executed |
336 | Independent Energy Estimation of Energy Yield for 8.4 MW Project in Madhya Pradesh and 1.5 MW in Tamil Nadu. | Vaibhavlaxmi Clean Energy LLP | 2012 | Executed |
337 | Lender's Independent Engineer (LIE) Services for 25.2 MW Wind Power Project at Jasdan, District Rajkot, Gujarat of RenewWind Energy (Rajkot) Pvt. Ltd. | PTC India Financial Services Limited | 2012 | Executed |
338 | Consultancy Services for Technical Assistance in Development of RFP and Evaluation of bids for establishment of Windfarm. | Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Ltd.; | 2012 | Executed |
339 | Consultancy Services Agency to prepare F.S.R. for utilizing mined out land at Panandhro Lignite Project of GMDC Limited for renewable energy generation. | Gujarat Mineral Development Corporation Limited | 2012 | Executed |
340 | Energy Yield Report for 3 different variants for Bothe windfarm Project in Maharashtra. | Bothe Windfarm Development Pvt. Ltd. | 2012 | Executed |
341 | Independent Energy Estimation of 70 MW Wind Power Project in Satara District of Maharashtra. | Kenersys India Pvt. Ltd. | 2012 | Executed |
342 | Wind Resource Assessment for 30 MW at Project site Udgiri in Maharashtra | MSPL Limited | 2012 | Executed |
343 | Independent Wind Resource Assessment study for 100 MW Wind Power Project in Andhra Pradesh. | Acciona Energy India Pvt. Ltd. | 2012 | Executed |
344 | Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project at Ramasagaram (Tagguparthi), Anantpur District, Andhra Pradesh. | New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad | 2012 | Executed |
345 | Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project at Guravapalli, Anantpur District, Andhra Pradesh. | New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad | 2012 | Executed |
346 | Post Commissioning Monitoring of 52.5 MW Wind Power Project in Gujarat for another two years. | Gujarat State Petroluem Corporation Limited | 2012 | Executed |
347 | Independent Energy Estimation for 76 MW Wind Power Project at Girijashankarwadi in Maharashtra. | Kenersys India Pvt. Ltd. | 2013 | Executed |
348 | Independent Energy Estimation of 30 MW Wind Power Project at Dalot site, Rajasthan | Tata Power Company Limited, Mumbai | 2013 | Executed |
349 | Energy Yield Report for 2 different variants for Bothe windfarm Project in Maharashtra. | Bothe Windfarm Development Pvt. Ltd. | 2013 | Executed |
350 | Lender's Independent Engineer (LIE) Services for 51 MW Wind Power Project of Mytrah Vayu (Manjira): Pvt. Ltd. at Tiruppur District in Tamil Nadu. | PTC India Financial Services Limited | 2013 | Executed |
351 | Lender's Independent Engineer (LIE) Services for 30 MW Wind Power Project at Dalot District, Rajasthan. | Tata Power Renewable Energy Limited | 2013 | Executed |
352 | Estimation of Energy Yield for Proposed Wind Power Project in Ratalam District, M.P. | Surajbari WindFarm Development Pvt.Ltd, Mumbai | 2013 | Executed |
353 | Lender's Independent Engineer (LIE) Services for 19.5 MW Wind Power Project at Dalot District, Rajasthan. | Orange Renewable Power Pvt. Ltd. | 2013 | Executed |
354 | Lender's Independent Engineer (LIE) Services for 24 MW Wind Power Project in Maharashtra. | YES Bank Limited | 2013 | Executed |
355 | Site Identification for 200 MW Wind Power Project at Lahori site in Madhya Pradesh. | Inox Wind Infrastructure Limited, Noida | 2013 | Executed |
356 | Site Identification for 100 MW Wind Power Project at Katni site in Madhya Pradesh. | Renew Power Ventures Pvt. Ltd. | 2013 | Executed |
357 | Site Identification for 100 MW Wind Power Project at Maihar site in Madhya Pradesh. | Renew Power Ventures Pvt. Ltd. | 2013 | Executed |
358 | Site Identification for 100 MW Wind Power Project at Kotrabuzurg site in Madhya Pradesh. | Renew Power Ventures Pvt. Ltd. | 2013 | Executed |
359 | Site Identification for 100 MW Wind Power Project at Bamhori site in Madhya Pradesh. | Trishe Renewable Energy Solutions | 2013 | Executed |
360 | Wind Mast Data Collection, Analysis and Validation from C-WET at Vadagaon Range, Tal. Mulshil, Pune, Maharashtra. | Hiranandani Renewable Energy Pvt. Ltd., Mumbai | 2013 | Executed |
361 | Performance Review of 16.5 MW Wind Power Project at Surajbari site in Gujarat. | Surajbari Windfarm Development Pvt. Ltd. | 2013 | Executed |
362 | Independent Energy Estimtion and Feasibility study for Chettinad Wind Power Projects in Tamil Nadu | Chettinad Cement Corporation Limited | 2013 | Executed |
363 | Feasibility Study for 50 MM Wind Power Project in Gujarat for Petronet LNG Limited, New Delhi | M.P. Windfarms Limited | 2013 | Executed |
364 | Estimation of Energy Yield for one combination of machines at Bothe Windfarm, Maharashtra | Bothe Windfarm Development Pvt. Ltd. | 2013 | Executed |
365 | Lender's Independent Engineer (LIE) Services for 19.5 MW Wind Power Project Completion Report at Dalot District, Rajasthan | Orange Renewable Power Pvt. Ltd. | 2013 | Executed |
366 | Lender's Independent Engineer (LIE) Services for 51 MW Wind Power Project of Mytrah Vayu (Manjira): Pvt. Ltd. at Tiruppur District in Tamil Nadu. | Union Bank of India Ltd. | 2013 | Executed |
367 | Preparation of Detailed Project Report for 54 MW Wind Power Project at Tagguparthi, District Ananthpur, Andhra Pradesh. | Energon Power Resources Pvt. Ltd., Bangalore. | 2013 | Executed |
368 | Feasibility Study for Wind Power Project in Kochi, Kerala for Petronet LNG Limited, New Delhi | M.P. Windfarms Limited | 2013 | Executed |
369 | Estimation of energy yield / validation of 11 Nos. K-82, 2 MW WEGs & 7 Nos. K-110, 2.4 MW WEGs at Girijashankarwadi in Maharashtra | Kenersys India Pvt. Ltd. | 2013 | Executed |
370 | Estimation of Energy Yield for 97/130 Locations with three different combinations of machines. | Bothe Windfarm Development Pvt. Ltd. | 2013 | Executed |
371 | Preparation of Bid Document/NIT and Bid evaluation including pre-bid meeting for 40 MW Wind Power Project for Petronet LNG Limited in Gujarat. | M.P. Windfarms Limited | 2013 | Executed |
372 | Estimation of Energy Yield for 97/130 Locations with three different combinations of machines. | Bothe Windfarm Development Pvt. Ltd. | 2013 | Executed |
373 | Site Identification for 400 MW Wind Power Project at Jura site in Kachchh, Gujarat. | Srijan Energy Systems Ltd. | 2013 | Executed |
374 | Site Identification for 24 MW Wind Power Project at Thagi site in Mandsaur District of Madhya Pradesh. | Consolidated Energy Consultants Ltd. | 2013 | Executed |
375 | Site Identification for 50 MW Wind Power Project at Katna site in Mandsaur District of Madhya Pradesh. | Consolidated Energy Consultants Ltd. | 2013 | Executed |
376 | Site Identification for 100 MW Wind Power Project at Nipaniya site in Mandsaur District of Madhya Pradesh. | Inox Wind Infrastructure Limited, Noida | 2013 | Executed |
377 | Site Identification for 50 MW Wind Power Project at Pasun site in Rajsamand District of Rajasthan. | Inox Wind Infrastructure Limited, Noida | 2013 | Executed |
378 | Site Identification for 100 MW Wind Power Project at Annupura site in Limkheda District of Gujarat. | 2013 | Executed | |
379 | Site Identification for 200 MW Wind Power Project at Taladari site in Rajsamand District of Rajasthan. | 2013 | Executed | |
380 | Appointment of an Engineering Consultant for Setting up of up to 300 MW Wind Power Project in the State of Gujarat. | Gujarat Industries Power Company Ltd | 2014 | Executed |
381 | Civil Assessment Work for 10.5 MW Project in Madhya Pradesh. | Sterling Agro Industries Ltd. | 2014 | Executed |
382 | Techno-Economic Feasibility Report (TEFR) for onshore Wind farm at Devghar, Maharashtra. | Hiranandani Renewable Energy Pvt. Ltd., | 2014 | Executed |
383 | Energy Validation Report for 10 MW Wind Power Project at Girijashankarwadi site, Satara District in Maharashtra. | Kenersys India Pvt. Ltd. | 2014 | Executed |
384 | Micro-siting of 100 Nos. Vestas V-100 WEG in the area adjacent to the windfarm project in Mamatkheda, Ratlam District of M.P. | Surajbhari Windfarm Pvt. Ltd. | 2014 | Executed |
385 | Post Commissioning Monitoring of 18.9 MW in Gujarat - Extended period | Gujarat State Petroluem Corporation Limited | 2014 | Executed |
386 | Energy Estimation of 40 MW Wind Power Project in Maharashtra | Inox Renewables Limited | 2014 | Executed |
387 | Energy Estimation of 28 MW Wind Power Project in Kukru, Madhya Pradesh | Inox Renewables Limited | 2014 | Executed |
388 | Estimation of wind energy resource assessment of 20 MW Wind Power Project consisting of 10 Nos. WTG of Gamesa G-97 at Dewas in M.P. | Panama Wind Energy Krishna Pvt. Ltd. | 2014 | Executed |
389 | Site Identificaton for 100 MW Wind Power Project at Shamgarh, District Mandsaur in Madhya Pradesh. | Panama Wind Energy Krishna Pvt. Ltd. | 2014 | Executed |
390 | Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Bhandariya site, Taluka Sailana, Ratlam for 15 Nos. WEGs in Forest Land | Renew Power Pvt. Ltd., Mumbai | 2014 | Executed |
391 | Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Kharsod Khuri site, Taluka Barnagar, Ujjain for 34 Nos. WEGs in Govt. Land | Renew Power Pvt. Ltd., Mumbai | 2014 | Executed |
392 | Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Ralayta site, Taluka Badnawar, Dhar for 22 Nos. WEGs in Govt. Land and 20 Nos. WEGs in Forest Land | Renew Power Pvt. Ltd., Mumbai | 2014 | Executed |
393 | Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Mawdipura site, Taluka Dhar , Dhar for 26 Nos. WEGs in Forest Land | Renew Power Pvt. Ltd., Mumbai | 2014 | Executed |
394 | Installation and commissioning of 100 m height wind monitoring mast complete with necessary sensors for wind measurement and temperature measurmeent at a suitable location on the identified site in Mandsaur District of Madhya Pradesh. | Panama Wind Energy Krishna Pvt. Ltd. | 2014 | Executed |
395 | Independent Energy Yield Assessment Report for 54 MW Wind Power Project at Rojmal near Amreli in Gujarat. | Tata Power Renewable Energy Limited | 2014 | Executed |
396 | Pre-Feasibility Report for 30 MW Wind Power Project in Madhya Pradesh | Aspirance Services, France | 2014 | Executed |
397 | Lender's Independent Engineer (LIE) Services for 36 MW Wind Power Project of Jasdan Energy Pvt. Ltd. In Gujarat. M | State Bank of India, Mumbai | 2014 | Executed |
398 | Energy yield estimation for proposed 10 MW Wind Power Project at Lahas Village, Taluka: Bhaisdehi, District Betul, Madhya Pradesh. | Radical Energy, Pune | 2014 | Executed |
399 | Detailed DGPS Survey and Preparation of Detailed Project for 100 MW Wind Power Project at Shamgarh, District of Mandsaur, Madhya Pradesh. | Panama Wind Energy Krishna Pvt. Ltd. | 2014 | Executed |
400 | Wind Data Analysis and Estimation of Energy Yield for different make WEGs at Chimmanakatti in Bagalkot District, Karnataka. | MSPL Limited | 2014 | Executed |
401 | Micro-siting report for each WEGs for proposed Wind Power Project at Chimmanakatti in Bagalkot District, Karnataka. | MSPL Limited | 2014 | Executed |
402 | Preparation of Detailed Project Report for proposed wind power project at Chimmanakatti in Bagalkot District, Karnataka. | MSPL Limited | 2014 | Executed |
403 | Civil Assessment Work Foundation casting for 2 Machines in Andhra Pradesh and 4 Machines in Maharasthra. | Sterling Agro Industries Ltd. | 2014 | Executed |
404 | Lender's Independent Engineer (LIE) Services for Gamesa's 40 MW Wind Power Project at Gunga, District Barmer in Rajasthan of Clean Wind Power (Devgarh), New Delhi. | IndusInd Bank, Mumbai | 2014 | Executed |
405 | Lender's Independent Engineer (LIE) Services for Inox's 40 MW Wind Power Project at Dangri, District Jaisalmer in Rajasthan of Clean Wind Power (Devgarh), New Delhi. | IndusInd Bank, Mumbai | 2014 | Executed |
406 | Lender's Independent Engineer (LIE) Services for 50.4 MW Wind Power Project at Jaisalmer District in Rajasthan for Ostro Renewable Energy , New Delhi. | PTC India Financial Services Limited | 2015 | Executed |
407 | Appointment as consultant for post commissioning monitoring of 52.5 MW Wind Power Project at Jakhau site Kutch District, Gujarat for one year. | Gujarat State Petroleum Corporation Limited | 2015 | Under Execution |
408 | Estimation of Energy Yield Assessment for Wind Power Project in Ratlam District of Madhhya Pradesh considering one variant. | Continuum Energy | 2015 | Executed |
409 | Consultancy for As-Built Wind Resource Assessment and Energy Yield Estimation for 45 MW Windfarm site at Dalot in Rajasthan. | Green Infra Limited | 2015 | Executed |
410 | Consultancy support to conduct study on Roadmap for developing conducive framework for Repowering of Old Wind Turbines and assessment of maket potential in Inida | Idam Infrastructure Advisory Pvt. Ltd. | 2015 | Executed |
411 | Consultancy for estimation of Energy Yield Assessment for your proosed wind power project in Pathenagar & Peraballi, District Kurnool in Andhra Pradesh. | SunEdison Solar Power | 2015 | Executed |
412 | Consultancy Fee for estimation of Energy Yield Assessment for your proposed 26 MW Wind Power project in Amreli, Gujarat for two variants. | Kintech Synergy Pvt. Ltd. | 2015 | Executed |
413 | Estimation of Wind Power Potential at Molagavalli, Kurnool District and Preparation of Detailed Micro siting Map | New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad | 2015 | Executed |
414 | Consultancy for estimation of Energy Yield Assessment for 30 MW wind power project in Kundhda, District Bhavnagar in Gujarat. | SunEdison Solar Power | 2015 | Executed |
415 | Consultancy for Energy Yield Assessment for 2 Nos. 2.1 MW Suzlon Machines of 80 m Hub height and 1 No. S-97, 2.1 MW Suzlon machine of 90 m hub height at Tirumangalakurichi, Kovilpatti Taluk, Tuticorn District of Tamil Nadu. | GHCL Limited | 2015 | Executed |
416 | Consultancy for Wind Resource Assessment and Energy Yield Report for 193 MW wind power project in Mahuva, Matalpur & Kuchhdi in Gujarat. | K.P. Energy Pvt. Ltd., Surat | 2015 | Executed |
417 | Appointment of an Engineering Consultant for Setting up of up to 300 MW Wind Power Project in the State of Gujarat. | Gujarat Industries Power Company Ltd | 2015 | Executed |
418 | Conultancy for Energy Yield Assessment of 50 MW Windfarm Project at site Lahori in Madhya Pradesh. | Inox Wind Infrastructure Limited, Noida | 2015 | Executed |
419 | Energy Yield Assessment of 164 WEG Locations of Wind Power Project in Mammatkheda, District Ratlam, Madhya Pradesh | SkyZen Infrabuild Pvt Ltd, Mumbai | 2015 | Executed |
420 | Energy Yield Assessment of 3 Nos. 2.1 MW Suzlon make machines at Matalpar, District Bhavnagar in Gujarat. | K.P.L. International Ltd. | 2015 | Executed |
421 | Energy Yield Assessment of Gamesa's 13 Nos. G-97 2 MW Machiens in Amreli District of Gujarat | Kintech Synergy Pvt. Ltd. | 2015 | Executed |
422 | 3rd party Energy Yield Assessment for 20 MW Wind Power Project comprising 2 MW Inox Machines at Nipaniya, District Mandsaur in Madhya Pradesh. | Yogesh Agencies & Investments Pvt. Ltd., Mumbai | 2015 | Executed |
423 | 3rd party Energy Yield Assessment for 7.5 MW Wind Power Project comprising 1.5 MW Regen make Machines at Hathuniya, District Mandsaur in Madhya Pradesh. | Yogesh Agencies & Investments Pvt. Ltd., Mumbai | 2015 | Executed |
424 | Lender's Independent Engineer (LIE) Services for 90.10 MW Wind Power Project comprising of 53 Nos. GE - 1.7 MW Machines at Habour & Mokala in the District of Jaisalmer, Rajasthan being developed by M/s Mytrah Vayuy Som Pvt. Ltd. | PFC Limited, New Delhi | 2015 | Executed |
425 | Lender's Independent Engineer (LIE) Services for 50 MW Wind Power Project comprising of 25 Nos. Inox - 2 MW Machines at Nipaniya in the District of Mandsaur, Rajasthan being developed by M/s Mytrah Vayuy Som Pvt. Ltd. | PFC Limited, New Delhi | 2015 | Executed |
426 | Lender's Independent Engineer (LIE) Services for 32 MW Wind Power Project comprising of 40 Nos. Wind World - 800 kW Machines at Sipla in the District of Jaisalmer, Rajasthan being developed by M/s Sipla Wind Energy Ltd. | PTC Financial Services Ltd. | 2015 | Executed |
427 | Lender's Independent Engineer (LIE) Services for 34.4 MW Wind Power Project comprising of 43 Nos. Wind World - 800 kW Machines at Jogihali in the District of Chitradurga, Karnataka being developed by M/s Sipla Wind Energy Ltd. | PTC Financial Services Ltd. | 2015 | Executed |
428 | Lender's Independent Engineer (LIE) Services for 50 MW Wind Power Project comprising of 25 Nos. Gamesa 2 MW Machines at Kukru in the District of Betul, Madhya Pradesh being developed by M/s Kukru Wind Power Pvt. Ltd. (Atria Power) | PTC Financial Services Ltd. | 2015 | Executed |
429 | Independent Energy Estimation of 4.2 MW comprising 2x2.1 MW Suzlon Machines at Ringnod in the District of Ratlam, Madhya Pradesh. | Ruchi Renewable Energy Pvt. Ltd. | 2015 | Executed |
430 | Independent Energy Estimation of 10.5 MW comprising 7x1.5 MW Regen make Machines at Ghatiya in the District of Ratlam, Madhya Pradesh. | Ruchi Renewable Energy Pvt. Ltd. | 2015 | Executed |
431 | Independent Energy Yield Assessment t for 20 MW Wind Power Project comprisng of 10 machines of Inox make at South Bhud in Maharashtra. | Inox Renewables Limited | 2015 | Executed |
432 | Independent Energy Estimation of 4.2 MW comprising 2x2.1 MW Suzlon Machines at Ringnod in the District of Ratlam, Madhya Pradesh. | Ruchi Renewable Energy Pvt. Ltd. | 2016 | Executed |
433 | Supervision during Foundation casting of 15 Nos. 800 kW Wind World WEGs at Anantpur District in Andhra Pradesh. | Sterling Agro Industries Ltd. | 2016 | Executed |
434 | Supervision during Foundation casting of 5 Nos. 2 MW Vestas make WEGs at Charabara site, Dwarka District in Gujarat. | Sterling Agro Industries Ltd. | 2016 | Executed |
435 | Technical Due Diligence and Micrositing including PLF& Energy Estimation for 30.75 MW Wind Power Project at Vaspeth in Maharashtra. | Tata Power Company Limited, Mumbai | 2016 | Executed |
436 | Technical Due Diligence and Micrositing including PLF& Energy Estimation for 100.5 MW Wind Power Project at Echanta in Tamil Nadu. | Tata Power Company Limited, Mumbai | 2016 | Executed |
437 | Performance evaluation of 32 MW Wind Power Project at Girijashankarwadi in Maharashtra | Tata Power Renewable Energy Limited | 2016 | Executed |
438 | Independent Energy Estimation of 30 MW Wiind Power Project at Lahori site in Madhya Pradesh. | Inox Renewables Limited | 2016 | Executed |
439 | Independent Energy Yield Assessment of 10 MW Wind Power Project at Nipaniya in Madhya Pradesh | Inox Renewables Limited | 2016 | Executed |
440 | Lenders Indpendent Engineer Services for 50 MW Wind Power Project at Lahori Village, Shajapur District of Madhya Pradesh | Tata Power Renewable Energy Limited | 2016 | Executed |
441 | Lenders Independent Engineer Services for 40.5 MW Wind Power Project at Tirumalayapalli, District Cuddapah in Andhra Pradesh. | IndusInd Bank, Mumbai | 2016 | Executed |
442 | Performance evaluation of 10 MW Wind Power Project at Visapur site in Maharashtra. | Tata Power Renewable Energy Limited | 2016 | Executed |
443 | Addional exercise work for Independent Energy Yield Assessment of 30 MW Wind Power Project for change of one location at Lahori Project in Madhya Pradesh. | Inox Renewables Limited | 2016 | Executed |
444 | Technical Due Diligence for 273.5 MW Wind Power Project operational at in different States in India. | Hindustan Zinc Ltd., Udaipur | 2016 | |
445 | Performance review of 40 MW Wind Power Project at Dangri, Jaisalmer, Rajasthan being developed by Clean Wind Power (Devgarh) Pvt. Ltd. | IndusInd Bank, Mumbai | 2016 | Executed |
446 | Lenders Indpendent Engineer Services for 26 MW Wind Power Project at District Morbi in Gujarat being developed by M/s Ratabhe Renewable Energy Pvt. Ltd. | State Bank of India, Mumbai | 2016 | Executed |
447 | Lenders Indpendent Engineer Services for 26 MW Wind Power Project at District Amreli in Gujarat being developed by M/s Amreli Renewable Energy Pvt. Ltd. | State Bank of India, Mumbai | 2016 | Executed |
448 | Energy Yield Assessment of 28 Nos. Suzlon Make 2.1 MW Machines at Jodiya site, District Jamnagar in Gujarat. | GHCL Limited | 2016 | Executed |
449 | Lenders Indpendent Engineer Services for 29.4 MW Wind Power Project at Dewas District in Madhya Pradesh being developed by M/s AVP Power Infra Pvt. Ltd. (Ostro Renewable Energy) | PTC Financial Services Ltd. | 2016 | Executed |
450 | Lenders Indpendent Engineer Services for 29.4 MW Wind Power Project at Dewas District in Madhya Pradesh being developed by M/s Badoni Power Pvt. Ltd. (Ostro Renewable Energy) | PTC Financial Services Ltd. | 2016 | Executed |
451 | Energy Yield Assessment of 13 Nos. Suzlon Make 2.1 MW Machines at Jodiya site, District Jamnagar in Gujarat. | GHCL Limited | 2016 | Executed |
452 | Lenders Indpendent Engineer Services for 26 MW Wind Power Project at Rojmal & Viravadi, Taluk Gadagada in Gujarat being developed by M/s Raipar Renewable Energy Pvt. Ltd. | State Bank of India, Mumbai | 2016 | Executed |
453 | Lenders Indpendent Engineer Services for 62 MW Wind Power Project at Village Godalada in Gujarat being developed by M/s Sukhavala Renewable Energy Pvt. Ltd. | State Bank of India, Mumbai | 2016 | Executed |
454 | Lender's Independent Engineer services for 25.3 MW Wind Power Project at Anantapur District in Andhra Pradesh being developed by M/s Dhanu Wind Park Pvt. Ltd. | PTC India Financial Services Ltd. | 2016 | Executed |
455 | Energy Audit of 6 Nos. Enercon make 800 kW WTG installed at Sankaneri, Tirunelveli District of Tamil Nadu. | GHCL Limited | 2017 | Executed |
456 | Energy Audit of 6 Nos. Enercon make 600 kW WTG installed at Dharapuram, Coimbatore District of Tamil Nadu. | GHCL Limited | 2017 | Executed |
457 | Lender's Independent Engineer services for 36 MW Wind Power Project at Shajapur District in being developed by M/s Renew Wind Energy Pvt. Ltd. | PTC India Financial Services Ltd. | 2017 | Executed |
458 | Performance Analysis for 2.1 MW Wind Turbine Suzlon make installed at Matalpur in Gujarat. | Sonu Handicrafts, Jaipur | 2017 | Executed |
459 | Performance Analaysis of 250 kW Wind Turbine installed at Jaigaon site in Satara District of Maharashtra. | Sanjay Ahuja Property Trade, Mumbai | 2017 | Executed |
460 | Technical Due Diligence of India based Windfarms bearing capacity of 24 MW, 39.1 MW& 40 MW respectively in District of Ananthpur & Kurnool in Andhra Pradesh, India. | Stantec S.p.A., Italy | 2017 | Executed |
461 | Appointment of Engineering Consultant Consultancy Services for setting up of 200 MW Wind Power Project in Gujarat | Gujarat Industries Power Company Ltd. | 2017 | Under Execution |
462 | Feasibility study of Wind Power Project in Madhya Pradesh | Vardhman Acrylics Ltd. | 2017 | Under Execution |
463 | Energy Yield Assessment of 20 MW Wind Power Project in Karnataka. | Shree Cements Ltd. | 2017 | Executed |
464 | Energy Yield Assessment for 20 MW Wind Power project of change of location in Karnataka. | Shree Cements Ltd. | 2017 | Executed |
465 | Energy Yield Assessment & Selecton of 9 best locations | Amarjothi Spinning Mills Ltd. | 2018 | Executed |
466 | Wind Resource Assessment, Energy Yield Assessment & Performance Analysis report for Karnataka Wind Power Project | MSPL Limited | 2018 | Under Execution |
467 | Wind Resource Assessment, Energy Yield Assessment and Micro-siting for Hospet Wind Power Project | Ramgad Minerals and Mining Ltd. | 2018 | Executed |
468 | Technical consultancy services for Machine Health Assessment and Asset Management of 24 MW Wind Power Project in Rajasthan. | RBL Bank | 2018 | Under Execution |
469 | Lender's Independent Engineer services for 50.4 MW Wind Power Project at Koppal District in Karnataka being developed by M/s Skerion Renewable Energy Pvt. Ltd. | PTC India Financial Services Ltd. | 2018 | Executed |
470 | Lender's Independent Engineer services for 52.50 MW Wind Power Project at Koppal District in Karnataka being developed by M/s Saroja Renewable Energy Pvt. Ltd. | PTC India Financial Services Ltd. | 2018 | Executed |
471 | Wind Resource Assessment, Energy Yield Assessment and Micro-siting for additional two variants for Hospet Wind Power Project | Ramgad Minerals and Mining Ltd. | 2018 | Executed |
31.03.2018 |