The list of the wind energy assignments managed by CECL is given here along with brief description of the task and the name of the client and the year in which work was/is managed:

Upto 31/03/2018

Sl. Description of Project Client Year Status
1 Design of electrical control system for wind power generation in stand-alone and controlled mode. Aeropower Pvt.Ltd.Bhopal 1986 Executed
2 System and detailed design for Stand-alone wind electric power generation system at Kukru, Betul, M.P. as pilot project of 50kW including design and supply of tower, erection, commissioning and maintenance for first year after putting into regular M.P. Urja Vikas Nigam 1986 Executed
3 Feasibility Report on 2 MW Wind Farm at Kukru, Betul M.P. M.P. Urja Vikas Nigam. 1986 Executed
4 Detailed Project Report on 2 MW Wind farm at Kukru, Betul, M.P. M.P. Urja Vikas Nigam. 1986 Executed
5 Installation of 1 kW Wind Electric Battery Charger including design, supply and erection of tower at Bhopal. M.P. Urja Vikas Nigam. 1986 Executed
6 Identification of sites for 1 kW Wind Electric Battery Charger for wide use in M.P. M.P. Urja Vikas Nigam. 1986 Executed
7 Identification of sites, feasibility study, detail project design, supervision of site work and monitoring of 25 kW Stand-Alone Wind Electric Generators in U.P.,Himachal Pradesh and Rajasthan including co-ordination with Dutch manufacturers. DNES, Ministry of Energy. 1988 Executed
8 Feasibility Mission on Wind-Diesel project at Lakshadweep DANIDA, Govt. of Denmark 1989 Executed
9 Monitoring of 6 Nos. 90 kW grid connected Wind Electric Generators installed under DANIDA Scheme in M.P., Gujarat, Orissa, Maharashtra & Tamil Nadu including computer aided analysis of performance and availability of resources & co-ordination with DNES, Ministry of Energy. 1989 Executed
10 Feasibility study and project report of effective utilization of biomass, solar and wind energy in Lakshadweep and Andaman & Nicobar group DNES, Ministry of Energy. 1989 Executed
11 Preparation of Master Plan for development of Wind Farms (Total capacity 540 MW) in Tamil Nadu. DNES,Ministry of Energy and Tamil Nadu Energy Development Agency. 1990 Executed
12 Study of existing Grid condition in Okha Madi 'Wind Farm, Gujarat and suggesting remedial measures. Gujarat Energy Development Agency. 1990 Executed
13 Testing of 300 kW Wind Turbines before erection at Okha Madi Wind Farm Gujarat Energy Development Agency. 1990 Executed
14 Preparation of Detailed Project Report for 1.6 MW Wind Farm At Vijaydurg, Maharashtra Maharashtra Energy Development Agency 1990 Executed
15 Preparation of Detailed Project Report for 1.6 MW Wind Farm At Vijaydurg, Maharashtra at Elephanta Island. Maharashtra Energy Development Agency 1990 Executed
16 Analysis of technical documents & data, scrutiny of drawings & specifications, construction supervision technical services to State Agencies, co-ordination with implementing agencies and overseas agencies for 20 MW Wind Farm being implemented COWIconsult Denmark. 1991 Executed
17 Monitoring of 6 MW Kayathar,4 MW Muppandal and 10 MW Lamba DANIDA Wind Farm. COWIconsult Denmark. 1991 Executed
18 Study of Retro-fitting proposal for Puri Windfarm DANIDA, Govt. of Denmark 1991 Executed
19 Feasibility Study for 2 MW Wind Farms atTirumala & Ramagiri Hill in Andhra Pradesh. NEDCAP, Hyderabad 1991 Executed
20 Preparation of Detailed Project Report for 2 MW Wind Farm at Kakulakonda in Andhra Pradesh. Non-conventional Energy Dev. 'Corpn. of Andhra Pradesh. 1991 Executed
21 Preparation of Detailed Project Report for 2 MW Wind Farm at Ramagiri Hills in Andhra Pradesh. Non-conventional Energy Dev. 'Corpn. of Andhra Pradesh. 1991 Executed
22 Preparation of Master Plan for Wind Power Development in the State of Andhra Pradesh Non-conventional Energy Dev. 'Corpn. of Andhra Pradesh. 1991 Executed
23 Feasibility Mission on 50-100 MW Wind Farm in Tamil Nadu/Gujarat. The World Bank 1991 Executed
24 Study of Grid and Providing Suggestions for improvement of transmission grid condition in Saurashtra and Kutchh area of Gujarat. DANIDA, Govt. of Denmark 1991 Executed
25 Preparation & Evaluation of Tenders (WEG,Civil & Electrical) for 5 MW Windfarm Project at Jogimatti, Chitradurga district of Karnataka. Graphite India Ltd., Calcutta 1992 Executed
26 Preparation of Detailed Project Report for 5 MW Wind Farm at Jogimatti Hills in Chitradurga District of Karnataka. Karnataka Power Corpn.Ltd. 1992 Executed
27 Preparation & Evaluation of Tender Documents for 2MW Windfarm at Kappatgudda, Karnataka. Karnataka Power Corpn.Ltd. 1992 Executed
28 Construction Supervision of 2 MW Windfarm at Kappatgudda, Karnataka. Karnataka Power Corpn.Ltd. 1992 Executed
29 Preparation of Detailed Project Report for 2 MW Wind Farm at Kheda,Dist.Dhar,M.P. M.P.Urja Vikas Nigam Ltd. 1992 Executed
30 Technical Feasibility cum Market Study for manufacture of Wind Turbine Generators in India. I.J. Raju and Associates, Delhi 1993 Executed
31 Preparation of Project Document on Wind Farm Sector. Indian Renewable Energy Development Agency Ltd. 1993 Executed
32 Conducting Logistic Studies for Developing 4MW Windfarm at Kappatgudda. Karnataka Power Corpn.Ltd. 1993 Executed
33 Preparation of Tender Documents for procure-'ment of wind turbines & associated electrical and civil works for 1.5 MW Wind Farm at Vijaydurg. Maharashtra Energy Development Agency, Bombay. 1993 Executed
34 Supervision of construction,erection and commissioning of 1.5MW Windfarm at Vijaydurg, Maharashtra. Maharashtra Energy Development Agency,Bombay 1993 Executed
35 Preparation of Detailed Project Report & 'Tender Documents for a 10MW Wind Farm at Perungudi, Tamil Nadu Mohan Breweries and Distilleries Ltd. Madras 1993 Executed
36 Preparation of Feasibility Report for a 15 MW Windfarm at Jamgod, Dist.Dewas, M.P. AEC (India) Ltd.New Delhi 1994 Executed
37 Opportunity for wind energy sector qt various location in India Industrial Development services Pvt.Ltd Asian Development Bank 1994 Executed
38 Consultancy Service for 4 MW Windfarm at Muppandal, Tamil Nadu (DPR). Dalmia Cement (Bharat)Ltd. 1994 Executed
39 Preparation & Evaluation of Tender Documents for 4MW Windfarm at Muppandal, T.N. Dalmia Cement (Bharat)Ltd. 1994 Executed
40 Preparation & Evaluation of Tender for 4 MW Windfarm Dalmia Cement (Bharat)Ltd. 1994 Executed
41 Preparation of Tender Document for procurement of WEGs for 2 MW Phase-II windfarm and Micrositing at Muppandal, Tamil Nadu Dalmia Cement (Bharat)Ltd. 1994 Executed
42 Supervision of construction,erection and commissioning for 2 MW Phase-II windfarm at Muppandal, Tamil Nadu. Dalmia Cement (Bharat)Ltd. 1994 Executed
43 Preparation of Detailed Project Report for a 5 MW Wind Farm at Jogimatti,Chitradurga District of Karnataka. I.T.C. Limited, Calcutta 1994 Executed
44 Preparation of Detailed Project Report for a 10 MW Wind Farm at Kethanur, Tamil Nadu Kanishk Steel Industries Ltd., Salem 1994 Executed
45 Conducting Logistic Studies for Developing 5 MW Windfarm at Jogimatti Hills. Karnataka Power Corpn.Ltd. 1994 Executed
46 Preparation & Evaluation of Tender Documents for 10 MW Wind Farm at Perungudi, Tamil Nadu. Mohan Breweries and Distilleries Ltd. Madras 1994 Executed
47 Preparation of Detailed Project Report for 2 MW Wind Farm at Ransi, Pauri, U.P. Non-Conventional Energy Development Agency, U.P. 1994 Executed
48 Preparation of Detailed Project Report for 4.5MW Wind Farm at Kappatagudda, Karnataka Karnataka Power Corpn.Ltd. 1995 Executed
49 Preparation of Detailed Project Report & Tender Documents for a 15 MW Wind Farm at Jamgodrani, Dist. Dewas, M.P. M.P. Windfarms Ltd. 1995 Executed
50 Supervision of construction,erection and commissioning of 10 MW Windfarm at Perungudi, Tamil Nadu Mohan Breweries & Distilleries Ltd., Madras 1995 Executed
51 Preparation of Detailed Project Report for a 10MW Wind Farm at Dewas, M.P. REPL Engineering Ltd.Bombay 1995 Executed
52 Preparation of Detailed Project Report for 10 MW Windfarm at Poolavadi, Dist. Coimbatore, T.N. 20th Century Finance Corpn. Ltd., Bombay 1996 Executed
53 Preparation Tender Document for 10 MW Windfarm at Poolavadi, Dist. Coimbatore, T.N. 20th Century Finance Corpn. Ltd., Bombay. 1996 Executed
54 Preparation of Detailed Project Report for a '4 MW Windfarm at Karunkulam, Dist. 'Kanyakumari, Tamil Nadu. Dalmia Cement (Bharat) Ltd. 'Dalmiapuram 1996 Executed
55 Supervision of construction,erection and commissioning of 4MW Windfarm at Muppandal Tamil Nadu. Dalmia Cement (Bharat)Ltd. 1996 Executed
56 Supervision of construction,erection and commissioning for 4 MW Phase-III windfarm at Muppandal, Tamil Nadu. Dalmia Cement (Bharat)Ltd. 1996 Executed
57 Supervision of construction,erection and commissioning for 3 MW Phase-IV windfarm at Muppandal, Tamil Nadu. Dalmia Cement (Bharat)Ltd. 1996 Executed
58 Supervision of construction,erection and commissioning for 2 MW windfarm at Karunakulam Dist. Kanyakumari, T.N. Dalmia Cement (Bharat)Ltd. 1996 Executed
59 Preparation of Pre-feasibility Report for 5MW 'windfarm at Navadra, Dist. Jamnagar, Gujarat Gujarat Mineral Development 'Corpn. Ahemadabad 1996 Executed
60 Preparation of Pre-feasibility Report for 5MW 'windfarm at Dhank, Dist. Rajkot, Gujarat Gujarat Mineral Development 'Corpn. Ahemadabad 1996 Executed
61 Preparation of Master Plan for development of 'Windfarms at Dewas (M.P.), (52 MW) M.P. Urja Vikas Nigam 1996 Executed
62 Construction Supervision of 15 MW Windfarm project at Jamgodrani, Distt. Dewas, M.P. M.P. Windfarms Ltd. 1996 Executed
63 Preparation of Feasibility Report for a 5 MW Windfarm at Jetpura,Dist.Indore, M.P. Madhya Bharat Papers Ltd., Calcutta. 1996 Executed
64 Preparation of Detailed Project Report for a 2 MW Windfarm at Fraserganj, West Bengal West Bengal Renewable Energy Development Agency 1996 Executed
65 Preparation of Tender Document for 'Wind-Diesel Energy Generation in Agatti & Kavaratti Islands, Lakshadweep Administration of the Union Territory 'of Lakshadweep 1997 Executed
66 Preparation of Master Plan for development of 50 MW Windfarms around Chikidi Windmast, Karnataka NEPC-India Ltd, Chennai 1997 Executed
67 Investigation for High Windfarm Losses at 5.6 MW IPCL Windfarm at Gujarat NEPC-India Ltd, Chennai 1997 Executed
68 Preparation of Master Plan for 45 MW Windfarms around Gadag, Karnataka NEPC-India Ltd, Chennai 1997 Executed
69 Performance survey of 13 windfarm in Tamil Nadu (Total 100 WEGs) NEPC-Micon Limited, Chennai 'Development Ltd. Chennai 1997 Executed
70 Performance Review for improvement for 2 MW windfarm at Vadavalli, T.N. Srinivasa Shipping & Property 1997 Executed
71 Performance Review & Improvement in Windfarm Revenue for 4 windfarms in T.N. Winrock International (REPSO), Delhi 1997 Executed
72 Vetting of DPR & Evaluation of composite Tender for 3 MW windfarm project at Kadavakallu in Andhra Pradesh Andhra Pradesh Windfarm 'Ltd. Hyderabad. 1998 Executed
73 Preparation of Detailed Project Report for 2 MW windfarm at Ramakkalamedu (Kuruvikkanam), Kerala ANERT, Thiruvanthapuram 1998 Executed
74 Preparation of Detailed Project Report for 2 MW 'windfarm at Sogi Hills, Dist. Bellary, Karnataka KREDL, Bangalore 1998 Executed
75 Preparation of Detailed Project Report for 9 MW & Supervision of 2MW windfarm at Malasamudra, Beladadi & Nagavi near Gadag, Karnataka NEPC-India Ltd, Chennai 1998 Executed
76 Verification of Power Law Index in 4 different locations in India Winrock International (REPSO), Delhi 1998 Executed
77 Supervision of 4 nos. 750 kW WEG tower foundation at Karungulam Dist. Tirunelveli (T.N.) Asian Wind Turbines (P) Ltd. (AWT) Chennai. 1999 Executed
78 Supervision of construction,erection and commissioning for 3 MW windfarm at Karunakulam Dist.'Tirunelveli, T.N. Dalmia Cement (Bharat)Ltd. 1999 Executed
79 Performance Review & Improvement in 10 WEGs of the windfarm. M.P. Windfarms Ltd., Dewas 1999 Executed
80 Preparation of Detailed Project Report for 25MW 'windfarm at Nagda hills range (i.e. Kalapahar, Kadarkhow and Shankargarh near Dewas) M.P. Windfarms Ltd., Dewas 1999 Executed
81 Preparation of Detailed Project Report for 2 MW 'windfarm at Devgarh, Rajasthan REDA, Rajasthan 1999 Executed
82 Micro-siting of 2 WEGs at Lamba Gujarat Elecon Engg. Co. Ltd. Gujarat 2000 Executed
83 Wind Resource Assessment & Master Plan forv 20 locations in various States in India. Indian Institute of Tropical Meteorology, Bangalore 2000 Executed
84 Preparation of Tender Document & Evaluation for 5 MW Windfarm project at Dewas M.P. Windfarms Ltd., Dewas 2000 Executed
85 Procurement Services for 5 MW Windfarm at Nagda Hill Dist. Dewas M.P. M.P. Windfarms Ltd., Dewas 2000 Executed
86 Performance Evaluation & Improvement of 13 MW Windfarm at Jamgodrani Dist. Dewas M.P.(Ph-III) M.P. Windfarms Ltd., Dewas 2000 Executed
87 Preparation of Detailed Project Report for 2 MW 'windfarm at Phalodi, Rajasthan REDA, Rajasthan 2000 Executed
88 Identification of 2 sites (approx.25 MW each) near Jaisalmer & Phalodi in Rajasthan Suzlon Energy Ltd, Ahmedabad 2000 Executed
89 Micro Survey of Wind Resource around 12 selected wind monitoring stations in India Centre for Wind Energy Technology, Chennai 2001 Executed
90 Site visit & Brief Report for 3 MW Windfarm near Madanayakanhalli, Karnataka Encon Services Ltd, Chennai 2001 Executed
91 Review of Performance of 7.5 MW Windfarm at Muppandal, T.N Fenner (India) Ltd. Madurai, T.N. 2001 Executed
92 Detailed Project Report for 3.46 MW Windfarm At Jaisalmer, Rajasthan Premium Ferro Alloys Ltd, Cochin Kerala 2001 Executed
93 Wind Power Density Maps at 70 m and estimation of Generation for Jaisalmer & Phalodi, Rajasthan Suzlon Energy Ltd, Ahmedabad 2001 Executed
94 Preparation of WPD maps and selection of sites around Jaisalmer Wind Monitoring Station Rajasthan Suzlon Energy Ltd, Ahmedabad 2001 Executed
95 Techno-Commercial Evaluation and Micrositing of 6 to 7 MW Windfarm at Sankaneri,Tamil Nadu Amarjothi Spinning Mills Ltd Tamil Nadu 2002 Executed
96 DPR for 2 MW Windfarm at Mahuriya, M.P. (Civil & Elect.) Centre for Wind Energy Technology 'Chennai 2002 Executed
97 DPR for 2 MW Windfarm at Mamatkheda,M.P. (Civil & Elect.) Centre for Wind Energy Technology 'Chennai 2002 Executed
98 Micrositing of 6 Nos, 300 kW WEGs at Lamba Elecon Engineering Co. Ltd Gujarat 2002 Executed
99 Techno-Commercial Evaluation of Bids for 4-5 MW Windfarm at Tamil Nadu Gujarat Heavy Chemical 'Industries Ltd., Noida 2002 Executed
100 Performance Evaluation of Wind-Diesel System at Sagar Island, West Bengal India-Canada Environment Facility (ICEF), New Delhi 2002 Executed
101 Preparation of DPR for 2 MW Windfarm at Mavinhunda, Distt. Belgaum, Karnataka Karnataka Renewable Energy Development Ltd., Bangalore 2002 Executed
102 Financial Advisory Services - Petitions pertaining to Wind Power Projects in Maharashtra Maharashtra Electricity Regulatory Commission (MERC), Mumbai 2002 Executed
103 Preparation of Sales Tax Incentive Policy for 'Wind Power Projects Maharashtra Energy Development Agency,Pune 2002 Executed
104 Preparation of T.O.R for Wind Energy Mapping in Nepal MSG Environmental Services New Delhi 2002 Executed
105 Performance study of 2.25 MW Windfarm at Devgarh,Rajasthan NEG Micon (India) Pvt. Ltd. 'Chennai 2002 Executed
106 Preparation of DPR for 2 MW Demo. Windfarm at Narsimhakonda, Dist. Nellore, Andhra Pradesh Non-conventional Energy Development Corpn. of Andhra Pradesh 2002 Executed
107 Estimation of generation at Akal and Sodha Sites near Jaisalmer, Rajasthan NEG-Micon (India) Pvt. Ltd Chennai 2002 Executed
108 Identification of site for 35-40 MW windfarm Project Amarjothi Spinning Mills Ltd Nambiyur, Tamil Nadu 2003 Executed
109 Micro Survey of Wind Resource around 10 selected wind monitoring stations in India Centre for Wind Energy Technology, Chennai 2003 Executed
110 Identification of site and preparation of Detailed Feasibility Report for 1 MW Wind 'Power Project in Rajasthan GAIL India Ltd. New Delhi 2003 Executed
111 Estimation of Annual Energy Generation at Mavinhunda & Sogi windfarm project sites. Karnataka Renewable Energy Development Ltd Bangalore 2003 Executed
112 Marking of project are including approach road at Sogi & Mavinhunda demo. Project Karnataka Renewable Energy Development Ltd Bangalore 2003 Executed
113 Tender Evaluation for 5 MW Demo/windfarm project at Jagmin (Chalkewadi), Dist. Satara Maharashtra Energy Development Agency, Pune 2003 Executed
114 Carrying out contour survey : Jagmin wind power project Maharashtra Energy Development Agency, Pune 2003 Executed
115 Carrying out Financial Analysis and preparation of Project/Tender documents for Inviting the proposals for setting up wind power projects of 20-25 MW capacity under Build, Operate and Transfer (BOT) basis Maharashtra Energy Development Agency, Pune 2003 Executed
116 Selection of site for 2.24 MW Windfarm near Devgarh, Rajasthan and estimation of generation NEG-Micon (India) Pvt. Ltd Chennai 2003 Executed
117 Performance Improvement 2.25 MW windfarm at Pratapgarh NEG-Micon (India) Pvt. Ltd Chennai 2003 Executed
118 Identification of sites for installation of 10 Nos. wind monitoring masts in Rajasthan NEG-Micon (India) Pvt. Ltd Chennai 2003 Executed
119 Selection of sites in Rajasthan at devgarh, Harshnath & Khodal Suzlon Energy Ltd 2003 Executed
120 Collection of land details from Revenue/Forest Dept./Private parties for Windfarm project Suzlon Energy Ltd Ahmedabad 2003 Executed
121 Identification of sites for installation of 10 Nos. wind monitoring masts in Rajasthan Suzlon Energy Ltd Ahmedabad 2003 Executed
122 Site identification for installing 3 x 1.65 MW WEG at Sankaneri, Tamil Nadu Amarjothi Spinning Mills Ltd Nambiyur 2004 Executed
123 Comments on Bid Documents for 500 MW Wind Power Projects in 5 States BSES Limited, Mumbai 2004 Executed
124 Preparation of DPR for 2 x 50 kW Wind Diesel Project at Keating Point Car Nicobar, Andaman & Nicobar Islands Centre for Wind Energy Technology, Chennai 2004 Executed
125 Micrositing of WEGs at Lamba W/Fsite,Gujarat Elecon Engg. Co. Ltd, Gujarat 2004 Executed
126 Site identification for 5 MW Windfarm Project Gujarat Heavy Chemicals Ltd Madurai 2004 Executed
127 Techno-Commercial Evaluation for 4 MW Windfarm in Tamil Nadu Gujarat Heavy Chemicals Ltd 'Noida 2004 Executed
128 Preparation/Vetting of Purchase Order/Purchase Agreement, O&M Agreement, Micrositing at site and Supervision of Construction, Erection & Commissioning of 6 Nos. 600 kW WEG of Enercon at Sankaneri, Dist. Tirunelveli, Tamil Nadu Gujarat Heavy Chemicals Ltd 'Noida 2004 Executed
129 Site identification for 100 MW each in 4 States and preparation of DFR for 100MW Windpower Project Hindustan Petroleum Corpn. Ltd New Delhi 2004 Executed
130 Review & Submission of ITB for implementation of 100 MW Wind Power Project Hindustan Petroleum Corpn. Ltd New Delhi 2004 Executed
131 Detailed Engineering Services for 12 MW Windfarm at Nagda Hill Dist. Dewas M.P. M.P. Windfarms Ltd., Dewas 2004 Executed
132 Identification of site, Wind Monitoring and Preparation of Detailed Project Report for 50 MW W/F in Maharashtra NEG-Micon (India) Pvt. 'Ltd., Chennai 2004 Executed
133 Micrositing and Supervision of construction, erection & Commissioning of 6 Nos. 800 kW WEG of Enercon at Poolavadi, Tamil Nadu Gujarat Heavy Chemicals Ltd 'Noida 2005 Executed
134 Detailed Project Report for creation of basic infrastructure facilities required for setting up 25 - 40 'MW windfarm in Bagalkot,Koppal&Gadag Dists. Karnataka Renewable Energy Development Limited, Bangalore 2005 Executed
135 Micrositing of 8 Nos. Suzlon make 1250 kW WEGs at Sankaneri, Tamil Nadu Rasi Seeds (P) Limited Salem, Tamil Nadu 2005 Executed
136 Detailed Project Report for development of 5 MW Windfarm near Gadag, Karnataka The Gadag Co-operative Inustrial Estate Ltd., Gadag, Karnataka 2005 Executed
137 Preparation of Pre-Feasibility Report for Wind Power Project at Bachelikhal, Uttaranchal Titagarh Wagons Ltd Kolkata 2005 Executed
138 Preparation of Report on Technical Collaboration for Manufacture of Wind Electric Generators Titagarh Wagons Ltd Kolkata 2005 Executed
139 Detailed study to verify, authenticate, modify the assumptions made by VEOL in respect of proposed installation of 70 MW W/F in the States of Tamil Nadu, Karnataka & Maharashtra Vishal Exports Overseas Ltd Ahemedabad 2005 Executed
140 Preparation of Feasibility Report, biding document & evaluation and supervision of construction, erection and commissioning of 50 MW ONGC W/F in Gujarat Oil & Natural Gas Corporation Ltd. Dehradun (Through MPWL) 2005 Executed
141 Supervision of construction, erection & commissioning of 15MW W/F at Nagda hill near Dewas M.P. Windfarms Ltd., Bhopal 2005 Executed
142 Consultancy services for 12 MW windfarm at a suitable site in Maharashtra Ahmednagar Municipal Corporation 'Ahmednagar 2006 Executed
143 Loss value calculation for shortage of wind mill generation Amarjothi Spinning Mills Ltd Nambiyur 2006 Executed
144 Consultancy services for Establishment of Manufacturing base for Wind Turbines in India Eagle Group, Surat 2006 Executed
145 Evaluation of Bids for 25MW Wind Power Project in the State of Maharashtra or Karnataka Hindustan Petroleum Corpn. Ltd Mumbai 2006 Executed
146 Engineering Services for 250/500 MW Windfarm Hindustan Zinc Ltd., Udaipur 2006 Executed
147 Engineering services for 50.4 MW Windfarm in Gujarat & 25.6 MW Wiundfarm in Maharashtra Hindustan Zinc Ltd., Udaipur 2006 Executed
148 Installation &Training of WASP& WINDFARMER softwares at MANIT, Bhopal Kanvas Enterprises, Bhopal 2006 Executed
149 Preparation of windfarm layout and generation assessment for 6 MW windfarm at Mavinhunda in Belgaum Dist. Karnataka Karnataka Renewable Energy Development Limited, Bangalore 2006 Executed
150 Consultancy Services for 2.5 MW Windfarm in Maharashtra Maharashtra Energy Development Agency, Pune 2006 Executed
151 Estimation of annual generation for 20MW W/F at Chakla nearDhule/Nandurbar in Maharashtra MSPL Limited, Karnataka 2006 Executed
152 Survey work for development of Windfarm near Hospet MSPL Limited, Karnataka 2006 Executed
153 Preparation of Detailed Project Report for 15 MW 'Windfarm at Nagda Hill Range, Dewas M.P. M.P. Windfarms Ltd., Dewas 2007 Executed
154 Technical Evaluation of sites including generation Potential & Technical review of contracts related to transactions for the sites in Karnataka (25.6 MW) DLF Limited New Delhi 2007 Executed
155 Technical Evaluation of sites including generation Potential & Technical review of contracts related to transactions for the site in Gujarat (150 MW) DLF Limited New Delhi 2007 Executed
156 Energy Estimation at NEG-Micon Offered sites near Tirunelveli in Tamil Nadu (36 MW) GMR Energy Limited Bangalore 2007 Executed
157 Energy Estimation at Suzlon Offered sites near Coimbatore in Tamil Nadu (47 MW) GMR Energy Limited Bangalore 2007 Executed
158 Carrying out Technical Due-Diligence of 48 x 250 kW WEGs in Coimbatore District, Tamil Nadu Gujarat Fluorochemicals Limited, Vadodara 2007 Executed
159 Supervision of Construction, Erection & Commissioning of 3 Nos. of 1650 kW WEGs at Timmappan Gudda, Dist. Belgaum, Karnataka Magma Leasing Limited Kolkata 2007 Executed
160 Energy Estimation for Vestas 1650kW WEGs (6.6 MW) at Vandhiya, Gujarat Magma Leasing Limited Kolkata 2007 Executed
161 Energy Estimation of 3 Nos. of 1650 kW WEGs at Timmappangudda, Dist,. Belgaum, Karnataka (5 MW) Magma Leasing Limited Kolkota 2007 Executed
162 Technical Analysis of C-WET Wind Turbine Test Report for NEG-Micon 950 kW power curve measurement IEC 61400-12 & C-WET report for MSPL on study and evaluation of 29.75 MW Wind power project at GR Halli, Chitradurga, Karnataka MSPL Limited Hospet, Karnataka 2007 Executed
163 Generation Estimate of 30 MW Windfarm at Surajbari in Gujarat MSPL Limited Hospet, Karnataka 2007 Executed
164 Energy Estimation for Vestas 600 kW machines (26.4 MW) at Sunnadahalli, Karnataka MSPL Limited Hospet, Karnataka 2007 Executed
165 Analysis of Wind data and Assessment of generation output for MSPL Windparks at Sogi & Jajikalgudda (115 MW) MSPL Limited output for MSPL Windparks at Sogi & Jajikalgudda Hospet, Karnataka 2007 Executed
166 Techno-Commercial Evaluation of VENSYS V-77 WEGs Vetco Enterprises Ltd 'Chennai 2007 Executed
167 Technical Evaluation of new sites including generation Potential & Technical review of contracts related to transactions for the sites in Gujarat & Karnataka (240.10 MW) DLF Limited New Delhi 2007 Executed
168 Turnkey Consultancy Services for Setting up of 10 MW Windfarm of GSFC at Bayath District Kutch in Gujarat Gujarat State Fertilizers & Chemicals Ltd., Gujarat 2007 Executed
169 Installation of wind masts,collection of wind data and analysis of the wind data (30 MW) MSPL Limited Hospet, Karnataka 2007 Executed
170 Consultancy for carrying out the contour survey and workout micrositing of Windfarm at Satara in Maharashtra Atlanta Power Project Pvt Ltd, Mumbai 2008 Executed
171 Technical Evaluation of sites including generation Potential & Technical review of contracts related to transactions for the site in Tamil Nadu (37.6 MW) DLF Limited New Delhi 2008 Executed
172 Detailed Project Report (DPR) for 4.8 MW Wind Power Project at Village Bargaon/Khamla, Near Kukru, Tehsil Bhainsdehi District Betul Marut-Shakti Energy India Ltd 2008 Executed
173 Detailed Project Report (DPR) for 4.8 MW Wind Power Project at Village Dhar, Near Kukru, Tehsil Bhainsdehi District Betul M.P.Windfarms Limited 2008 Executed
174 Supervision of construction, erection & commissioning of 150 MW W/F in Dist. Kachchh, Gujarat DLF Limited New Delhi 2008 Executed
175 Supervision of construction, erection & commissioning of 25.6 MW W/F in Dist. Gadag, Karnataka DLF Limited New Delhi 2008 Executed
176 Preparation fo the feasibility report for the development of wind park at Barmer 60-70 MW & Ratnagiri - 25-30 MW JSW Energy Limited, Mumbai 2008 Executed
177 Energy Estimation for Vestas 600 kW machines for the site at Harihar in Karnataka MSPL Limited Hospet, Karnataka 2008 Executed
178 Wind resource Assessment study at Basavana Bagewadi, Bijapur Distt and Haveri Distt. In Karnataka State Poorva Powergenco Ltd Bangalore 2008 Executed
179 Availing Lender's Engineering services for RS India Wind Energy Pvt LTd's 99.45 MW Wind based power project in Satara, Maharashtra Power Finance Corporation Ltd., New Delhi 2008 Executed
180 Consultancy for Evaluation and Suggestion for Improvement and Performance of 6x600 KW Enercon Machine for GHCL Wind Mill Phase - I, Muppandal (3.6 MW) GHCL Limited, Unit Shree Minakshi Mills, Paravai, Samayanallur (P.O.) Madurai 2008 Executed
181 Study of performance of Generation of 1.25 MW WEG installed in Dhule District, Maharashtra Magma Shrachi Finance Ltd., Magma House, 24, Park Street, Kolkata 2008 Executed
182 Technical Evaluation of sites including generation potential and technical review of the draft of the contracts to be entered into with the suppliers / contractors for new windfarm to be set up for the site Sinnar in Nasik District State of Maharashtra (51MW) DLF Limited New Delhi 2008 Executed
183 Feasibility Report for the windfarm at Pholodi Site, Distt. Jodhpur, Rajasthan (4.95MW) Ishwar Power Corp. Pvt. Ltd, New Delhi 2008 Executed
184 Verification of Power Curve based Guaranteed Generation for 150 MW Windfarm in Gujarat DLF Limited New Delhi 2008 Executed
185 Micrositing for 50 MW Windfarm Project at Jogimatti, Karnataka Poorva Powergenco Ltd Bangalore 2008 Executed
186 Wind Energy Estimation of 5 MW windfarm at Tivari Site of Jodhpur Distt. Rajasthan Magma Shrachi Finance Ltd., Magma House, 24, Park Street, Kolkata 2008 Executed
187 Technical Evaluation of sites including generation potential and technical review of the draft of the contracts to be entered into with the suppliers / contractors for new windfarm to be set up for the site Panapatti & Elevanthy in Tamil Nadu (34.5 mw) DLF Limited New Delhi 2008 Executed
188 Technical Evaluation of sites including generation potential and technical review of the draft of the contracts to be entered into with the suppliers / contractors for new windfarm to be set up for the site Ratan Ka Bas & Osiyan in Rajasthan (60 MW) DLF Limited New Delhi 2008 Executed
189 Generation Estimation of Enercon Make 13 Nos x 800 kW WEGs at Tivari site, Distt. Jodhpur, in Rajasthan (10.4 MW) MSPL Limited Wind Mill Division, Karnataka 2008 Executed
190 Feasibility Report for Setting up Wind Power Project at Village Vayor, Taluka Abdasa, Distt. Kutchh, Gujarat (50 MW) Jaiprakash Associates Ltd., JA House, 63, Basant Lok, Vasant Vihar, New Delhi 2008 Executed
191 Supervision of Construction, Erection & Commissioning of 4 MW (5 WEGs x 800 kW rating of Enercon make) windfarm at Tivari Site of Jodhpur Distt. Rajasthan Magma Shrachi Finance Ltd., Magma House, 24, Park Street, Kolkata 2008 Executed
192 Mandate for 24 MW Windfarm at Rahasta near Deverkulam in Tamil Nadu Green Infra Limited, Sector-33, plot No.19, Gurgaon 2008 Executed
193 Wind data collection for one year at Banakatti, Basarkatti & Almatti site and submission of analysis report on half yearly and yearly basis MSPL Limited Wind Mill Division, Karnataka 2008 Executed
194 Detailed Project Report for Development of 6 MW Windfarm near Khandake, Baradari, Tal. Dist. Ahmadnagar (Maharashtra). Dyaneshwar Energy Pvt. Ltd, Ahmadnagar 2008 Executed
195 RETA 6392 – TA for Supporting the Implementation of the Energy Efficiency Initiative in DMCs.(500 MW) Asian Development Bank, Manila, Philippines 2008 Executed
196 Detailed Project Report for Development of 16.25 MW Wind Power Project at Jogimatti Hills, Near Chitradurga, Karnataka Poorva Powergenco Ltd Bangalore 2008 Executed
197 Generation Estimation of three sites of Bagalkot District (Basarikatti, Banakatti & Almatti ) (10.4 MW) MSPL Limited Wind Mill Division, Karnataka 2008 Executed
198 Verification of Power Curve based Guaranteed Generation for 54 MW Windfarm in Rajasthan DLF Home Developers Limted, Gurgaon 2008 Executed
199 Verification of Power Curve based Guaranteed Generation for 34.5 MW Windfarm in Tamil Nadu DLF Home Developers Limted, Gurgaon 2008 Executed
200 Detailed Project Report (DPR) for 6 MW Wind Power Project at Sogi site in Bellary District in Karnataka Karnataka Renewable Energy Development Limited, Bangalore 2009 Executed
201 Detailed Project Report (DPR) for 6 MW Wind Power Project at Mavinhunda site in Belgaum District, Karnataka Karnataka Renewable Energy Development Limited, Bangalore 2009 Executed
202 Wind resource assessment and independent validation of Production Estimate for wind power projects in Tamilnadu and Karnataka (35 MW) KSK Energy Ventures Limited, Hyderabad 2009 Executed
203 Pre-feasibility towards the 60 MW Wind Power Project near Ranebennur, Haveri District Karnataka duly indicating the WASP analysis, Potential of the site, Energy Estimation for 3 types of WEGs and a preliminary financial analysis Abletech Electro Engineers (P) Ltd., Bangalore 2009 Executed
204 Wind Data Analysis and production estimate for 50 MW Wind Power Project in Gujarat. (Windfarm site at Vandhiya, Jakhau & Maliya Miyana) Gujarat State Petroleum Corporation Ltd, Gandhinagar 2009 Executed
205 Energy Estimation for 100 MW Wind Power Project in Tamil Nadu - Technical Evaluation Jindal Steel Power Ltd., Noida 2009 Executed
206 Probability calculation for Generation estimates corresponding to DLF 4 sites of Windfarm located in Gujarat (3 sites) and Karnataka (1 site). DLF Limited New Delhi 2009 Executed
207 Probability calculation for Generation estimates corresponding to DLF 3 sites of Windfarm located in Rajasthan (2 sites) and Tamil Nadu (1 site). DLF Home Developers Limted, Gurgaon 2009 Executed
208 Owner's Engineer/PMC for supervision & Inspection of construction, erection and commissioning activities of GSPC's 52.5 MW capacity Wind Power Project in District Kutchh, Gujarat Gujarat State Petroleum Corporation Ltd, Gandhinagar 2009 Executed
209 Feasibility Study for installation of two Wind Solar Hybrid Power System at Mussorie in Uttaranchal for ONGC. Oil & Natural Gas Corporation Ltd. Dehradun (Through MPWL) 2009 Executed
210 Feasibility Study for installation of two Wind Solar Hybrid Power System at Betul inGoa for ONGC. Oil & Natural Gas Corporation Ltd. Dehradun (Through MPWL) 2009 Executed
211 Technical Coordination and Site visit with Mr. Garrad Hassan for Assessment of wind farms / Generation Potential Forecast at Karnataka, Tamil Nadu, Gujarat and Rajasthan. DLF Limited New Delhi 2009 Executed
212 Transaction Advisory Services – Design, Construction, Finance, Operation &Maintenance of 25-40 MW Wind Park at Bigara, Mauritius CRISIL Infrastructure Advisory, New Delhi 2009 Executed
213 Consultancy Services for Wind Power Project - Selection of 4 suitable locations of WEGs Agro Solvent products Pvt. Ltd, Gwalior 2009 Executed
214 Consultancy Services for Wind Power Project -Guidelines on contract drafting to the Supplier Agro Solvent products Pvt. Ltd, Gwalior 2009 Executed
215 Performance Study of 2 Nos Suzlon make 1250 kW WEGs in Dhule District, Maharashtra (2.5 MW) Sri Anjaneya Cotton Mills Limited, Davangera, Karnataka 2009 Executed
216 Performance Study of 2 Nos Suzlon make 1250 kW WEGs in Dhule District, Maharashtra (2.5 MW) GEM Laboratories Pvt. Ltd.Davangera, Karnataka 2009 Executed
217 Consultancy Services for RCF's 25 MW Wind Power Project in Maharashtra (Techno-Commercial evaluation of Bids, Assessment of wind mast data & Micrositing, Study of power evacuation, preparation of bankable DFR) Rashtriya Chemicals & Fertilizers Ltd., Mumbai 2009 Executed
218 Technical Due Diligence of 16.5 MW Windfarm comprising 10 Nos VESTAS 1650 kW WEGs AT Surajbari, Dist. Kachchh in Gujarat SkyZen Infrabuild Pvt Ltd, Mumbai 2009 Executed
219 Preliminary Study for REPOWERING of Demonstration Windfarm in Tamil Nadu & Gujarat. (Kayathar, Kethanur, Muppandal, Dhank & Okhamadhi) for 20.6 MW Indian Renewable Energy Development Agency Ltd. (IREDA) (Through MPWL) 2009 Executed
220 Selection of 5 Suitable locations of WEGs offered by ENERCON At Ugawa, Dist. Jaisalmer, Rajasthan (4 MW) Sterling Agro Industries Ltd., New Delhi 2009 Executed
221 Establishment of 12 MW Wind Power Project in Gujarat - Preparation of TEFR, NIT, Bid Analysis & Recommendation, Draft Orders & Supervision service during Instalaltion &, commissioning of WEG Krishak Bharati Cooperative Ltd., Surat, Gujarat 2009 Executed
222 Consultancy Services for 100 – 150 MW Wind Power Project in India - (Procurement Services - Preparation of NIT & BID document, Techno-Commercial evaluation of bids & Finalization of contracts & orders agreement) SBI Capital Markets Limited, 'Mumbai – 400 005 2009 Executed
223 Preparation of Detailed Project Report for submition to MPUVN and preparation of Bankable DPR to submition to Financial Institutions - 49.5 MW Betul Wind Farms Limited, Gurgaon 2009 Executed
224 Energy Estimation of 38 x 800kW WTGs of Enercon Windfarm sites at Chavaneshwar at, Satara in Maharashtra &, V Kulam & Manur at Tirunelveli in Tamil Nadu Paharpur Cooling Towers Limited 2009 Executed
225 Reassessment of Generation from 14 Nos Enercon 800 kW WTGs at Ratedi, Dewas, MP. K.S. Oil Limited 2009 Executed
226 Energy estimation of 6 MW Wind Power Project at Kundur site in Karnataka PTC India Financial Services Limited, New Delhi 2009 Executed
227 Energy Estimation and selection of best 5 nos. Gamesa make WEGs near Theni Windfarm site Dist. Theni, in Tamil-Nadu. Amarjothi Spinning Mills Ltd
Erode Dt.Tamil Nadu
2010 Executed
228 Energy Estimation for 10x800 kW Enercon make machine at Tiwari site in Rajasthan K.S. Oil Limited, New Delhi 2010 Executed
229 Owner's Engineer/PMC for GSPL's Windfarm in Gujarat ( 27 WEGs of 1500 kW Suzlon make (40.50 MW) at Maliya Miyana site) Gujarat State Petronet Ltd, 'Gandhinagar
2010 Executed
230 Owner's Engineer/PMC for GSPL's Windfarm in Gujarat ( 8 WEGs of 1500 kW Suzlon make (12 MW) at Gorsar site) Gujarat State Petronet Ltd, 'Gandhinagar
2010 Executed
231 supervision during construction, erection and commissioning of SBI's Wind Power Project of 1.5 MW in Gujarat. SBI Capital Markets Limited, 'Mumbai – 400 005 2010 Executed
232 supervision during construction, erection and commissioning of SBI's Wind Power Project of 9 MW in Maharashtra. SBI Capital Markets Limited, 'Mumbai – 400 005 2010 Executed
233 supervision during construction, erection and commissioning of SBI's Wind Power Project of 4.5 MW in Tamil Nadu SBI Capital Markets Limited, 'Mumbai – 400 005 2010 Executed
234 Technical Feasibility study of the windfarm at Putlur (Tadpatri) windfarm site in Ananthapur district, Andhra Pradesh - 95 MW Bharath Wind farm Limited, Chennai
2010 Executed
235 Energy Estimation of Suzlon 2x1.5MW capacity WEG at Akal site in Rajasthan Sterling Agro Industries Ltd., New Delhi 2010 Executed
236 Energy Estimation of 25.5 MW windfarm at “Muthinpatti” site in Tamil Nadu Suzlon Energy Limited,
Pune, Maharashtra.
2010 Executed
237 Energy Estimation of 1 x 1500 kW Suzlon make machine in Tirunelveli District in Tamil Nadu Deccan Cements Limited, Hyderabad 2010 Executed
238 Energy Estimation of 2x1.5 MW (3 MW) wind energy projects at Kasturirengapuram Vilalge, Tirunelveli district, Tamil Nadu Dhanalakshmi Cotton & Rice Mills Pvt. Ltd, Guntur district, AP 2010 Executed
239 Energy Estimation of 2x1.5 MW machine each at Echanda & Balapathinaramapuram Village, Tirunelveli district, TN Idupulapadu Cotton Mills Limited, Guntur district, AP 2010 Executed
240 Power Curve Testing of GSPC 52.5 MW Wind Power Project at Jakhau site in Kutch district, Gujarat Gujarat State Petroleum Corporation Ltd. Gandhinagar 2010 Executed
241 Wind Potential Study for Repowering of an existing 8.1 MW windfarm site at Varapatti/Sultanpet in Coimbatore district in Tamil Nadu KSK Energy Ventures Limited, Hyderabad 2010 Executed
242 Techno-Commerical Evaluation of Offer made by Suzlon for 25.2 MW WPP comprising 12x2100 kW WEGs at Jaibhim site near Nizampur in Dhule district, Maharashtra and Scrutiny of orders to be placed Serum Institute of India Ltd, Pune 2010 Executed
243 Energy Estimation of 10.5 MW Windfarm consisting of 1x1.5 MW Suzlon WEGs at Kundram and Panapatti in Tamil Nadu Rohit Surfactants Pvt. Ltd, Kanpur 2010 Executed
244 Assessment of estimated generation of 21x600 kW (12.6 MW) WEG of Suzlon make at Palsodi site district Ratlam in Madhya Pradesh Jagdamba Power and Alloys Ltd., Raipur 2010 Executed
245 Assessment of estimated generation of 14 x 1500 kW (21 MW) WEG of Suzlon make at Minchiri site district Bellary, in Karnataka Jagdamba Power and Alloys Ltd., Raipur 2010 Executed
246 Assessment of estimated generation of 16 x 1500 kW (24 MW) WEG of Suzlon make at Mahuriya site district Shajapur in Madhya Pradesh Jagdamba Power and Alloys Ltd., Raipur 2010 Executed
247 Independent energy estimation of 20 MW windfarm comprising 25 nos. Enercon make 800 kW WEGs
at Silpa in Jaisalmer dist., Rajasthan
DCW Limited (DCWL), Mumbai 2010 Executed
248 Marking the location on toposheet for applying to Sri-Lankan Government for installation of wind monitoring masts for the Wind Resource Assessment at Sri Lanka ha 2010 Executed
249 Due Diligence of 2 nos. Enercon make 800kW WEGs at Kita in Jaisalmer district, Rajasthan GeeCee Ventures Limited,
(Formerly: Gwalior Chemicals Industries Limited), Mumbai
2010 Executed
250 Due Diligence of 3 Nos. Suzlon make 1250 kW WEGs at Akal in Jaisalmer District, Rajasthan GeeCee Ventures Limited, Mumbai
2010 Executed
251 Independent Energy Estimation
of Vestas 10 nos 1800 kW WEGs
at Surajbari, dist. Kachchh, Gujarat
Surajbari WindFarm Development Pvt.Ltd, Mumbai 2010 Executed
252 Evaluation of Bid as well as carrying out the due dilligence of the 10 MW Suzlon's 5x2.1MW Wind Power Projectin Tamil Nadu Ramky Enviro Engineers Ltd, Hyderabad 2010 Executed
253 Evaluation of Bid as well as carrying out the due dilligences of the 18 MW comprising Vestas's 10x1.8 MW Wind Power Project at Gujarat Ramky Enviro Engineers Ltd, Hyderabad 2010 Executed
254 Pre-Feasibility Study of 5 sites in Karnataka KSK Energy Ventures Limited, Hyderabad 2010 Executed
255 Preliminary assement, Detailed study and marking exact location of Mast at Hasan in Karnataka. SkyZen Infrabuild Pvt Ltd, Mumbai 2010 Executed
256 Development Phase activities of Wind Power Project at Tamil Nadu (25 MW) Tanjog Holding, Malaysia 2010 Executed
257 Development Phase activities of Wind Power Project at Karnataka (10 MW) Tanjog Holding, Malaysia 2010 Executed
258 Consultancy Services for Assessment of Investment Climate for Wind Power Development in India IREDA, New Delhi 2010 Executed
259 Due Diligence of 5x1.65 MW Machine at Revangaon in Maharashtra (8.25 MW) SkyZen Infrabuild Pvt Ltd, Mumbai 2010 Executed
260 Detailed Project Report (DPR) at Hunchi Benchi site in Karnataka KSK Energy Ventures Limited, Hyderabad 2010 Executed
261 Detailed Proejct Report (DPR) at Haveri site in Karnataka KSK Energy Ventures Limited, Hyderabad 2010 Executed
262 Detailed Project Report (DPR) at Talaricheru site in Andhra Pradesh. KSK Energy Ventures Limited, Hyderabad 2010 Executed
263 Detailed Project Report (DPR) at Tirumalayapalli site in Andhra Pradesh. KSK Energy Ventures Limited, Hyderabad 2010 Executed
264 Detailed Project Report (DPR) at Payalkuntla site in Andhra Pradesh. KSK Energy Ventures Limited, Hyderabad 2010 Executed
265 Technical Evaluation (Due Diligence) 97 Nos. V-100 Machines in Maharashtra (175 MW) SkyZen Infrabuild Pvt Ltd, Mumbai 2010 Executed
266 Opinion Report for Layout of 100 MW Windfarm Near Villagew Jaora (Mamatkheda), District Ratlam (M.P.) D.J. Energy Limited, Ratlam 2010 Executed
267 Post Commissioning Monitoring of 52.5 MW Wind Power Project in Gujarat Gujarat State Petroleum Corporation Limited 2010 Executed
268 Energy Estimation 6.3 MW Windfarm consisting of 3x2.1 MW Suzlon WTGs at Project site in Tejuva site at Rajasthan. Paharpur Cooling Towers Limited 2010 Executed
269 Preparation of Detailed Feasibility Report for Wind Power Project at Tirumala site, Andhra Pradesh. Green Energy Solutions, Hyderabad 2011 Executed
270 Independent energy estimation of Windfarm of 10.5 MW Capacity Suzlon S-88 Machines at Herada in the State of Karnataka.
Shree Jagdamba Energy LLP, Raipur 2011 Executed
271 Micrositing/Energy Estimation for 15 MW Windfarm in Belgaum District, Karnataka MSPL Limited 2011 Executed
272 Preparation of Detailed Project Report at Somandapalli site in Andhra Pradesh KSK Energy Ventures Limited, Hyderabad 2011 Executed
273 Preparation of Wind Resource Map for N-E States Including Sikkim and Ladakh region covering Leh and Kargil under Small Wind Energy & Hybrid Systems Programme 2010-11 Ministry of New & Renewable Energy, New Delhi. 2011 Executed
274 Re-powering of Windfarm located at Kayathar-Tamil Nadu. Arissan Power Limited, Kolkata 2011 Executed
275 Preparation of Detailed Feasibility Report for Windfarm at Village Bhanvaj, Taluka Khalapur,District Raigad, Maharashtra. Hindustan Electricity Generation Company Pvt. Ltd. 2011 Executed
276 Identification of Potential Area and Micrositing for 50 MW Wind Power Project in Orissa. KSK Energy Ventures Limited, Hyderabad 2011 Executed
277 Detailed Project Report for 15.2 MW Wind Power Project near Hospet, Karnataka MSPL Limited 2011 Executed
278 Re-powering of existing Wind Power Projects at Muppandal & Karungulam in Tamil Nadu Dalmia Bharat Sugar and Industries Limited 2011 Executed
279 Independent Energy Estimation of windfarm of 14 MW capacity at Thosegar in the State of Maharashtra. ReNew Power Pvt. Ltd.,Mumbai 2011 Executed
280 Independent Energy Estimation of 25 MW capacity Windfarm at Vhaspet in the State of Maharashtra. WinWind Power Energy Pvt. Ltd., Chennai 2011 Executed
281 Wind Resource Assessment at Navlakh Umbre, near Talegaon, Dist. Pune in Maharashtra Hiranandani Renewable Energy Pvt. Ltd., Mumbai 2011 Executed
282 Independent Energy Estimation of 42 MW windfarm capacity consisting of 28x1500 kW Machines in the State of Tamil Nadu. Green Infra Limited, New Delhi 2011 Executed
283 Independent Energy Estimation of 18 MW capacity consisting of 12x1500 kW Machines in the State of Maharashtra. Green Infra Limited, New Delhi 2011 Executed
284 Independent Energy Estimation of 31.5 MW capacity consisting of 15x2100 kW Machines in the State of Karnataka. Green Infra Limited, New Delhi 2011 Executed
285 Wind Resource Assessment at Vadgaon Range, District. Pune in Maharashtra Hiranandani Renewable Energy Pvt. Ltd., Mumbai 2011 Executed
286 Independent Energy Estimation of 30 MW windfarm capacity consisting of 15x2.00 MW Kenersys Machines in the State of Tamil Nadu. Green Infra Limited, New Delhi 2011 Executed
287 Due Diligence/Independent Energy Estimation of 28 MW Capacity at Ayyanathuru in Tirunelveli District, Tamil Nadu. Ramky Enviro Engineers Ltd, Hyderabad 2011 Executed
288 Preparation of Revised DPR for 6 MW Wind Power Project at Mavinahunda in Raybagh Taluk of Belgaum District Karnataka Renewable Energy Development Ltd.,, Bangalore 2011 Executed
289 Independent Performance Assessment/Energy Estimation of 4 MW Windfarm Capacity at Pusupathur of Dindigul District in the State of Tamil Nadu. K.S. Oil Limited, New Delhi 2011 Executed
290 Preparation of Detailed Project Report (DPR) for 100.8 MW Wind Power Project in Andhra Pradesh. Rayala Wind Pvt. Ltd.(Greenko) 2011 Executed
291 Preparation of Detailed Project Report (DPR) for 128 MW Wind Power Project in Karnataka. Fortune Five Hydel Projects Pvt. Ltd.(Greenko) 2011 Executed
292 Independent Energy Estimation of Windfarm of 18 MW Capacity in the State of Gujarat. Graphite India Ltd. 2011 Executed
293 Independent Energy Estimation of 123.2 MW Windfarm in Gujarat and Karnataka Hindustan Zinc Ltd 2011 Executed
294 Pre-feasibility Study for 15 MW Wind Power Project in Madhya Pradesh Moser Baer Ltd. 2011 Executed
295 Independent Energy Estimation of Windfarm of 15 MW Capacity in the State of Rajasthan Green Infra Limited, New Delhi 2011 Executed
296 Detailed Project Report for 49.5 MW Wind Power Project at Rasingapura in the State of Tamil Nadu Green Infra Limited, New Delhi 2011 Executed
297 Detailed Project Report for 18 MW Wind Power Project at Gude in the State of Maharashtra Green Infra Limited, New Delhi 2011 Executed
298 Independent Energy Estimation/Micrositing of 35-40 MW capacity Wind Power Project in the State of Karnataka Green Infra Limited, New Delhi 2011 Executed
299 Detailed Project Report for 35-40 MW capacity Wind Power Project in the State of Karnataka Green Infra Limited, New Delhi 2011 Executed
300 Detailed Project Report for 18 MW capacity Wind Power Project in the State of Rajasthan. Green Infra Limited, New Delhi 2011 Executed
301 Assistance for Preparation of Specific Chapters for DPR on “Livelihood Solutions” through Integrated Renewable Energy Towards Action and Learning (TAAL) 2011 Executed
302 Independent Energy Estimation of 9 MW Capacity Windfarm comprising 15 Nos. of 600 kW Suzlon Machines at Sailana, District Ratlam in the State of Madhya Pradesh. M/s Rohit Surfactants Limited, Kanpur 2011 Executed
303 Independent Performance Assessment/Energy Estimation of 16 MW Windfarm Capacity at Rathedi Hills of Dewas District in the State of Madhya Pradesh. K.S. Oil Limited, New Delhi 2011 Executed
304 Feasibility study for identification of Wind Power Project installation in Maharashtra. Warburg Pincus India Pvt. Ltd., Mumbai 2011 Executed
305 Feasibility study for identification of 43 MW Wind Power Project installation at Kuppam in Andhra Pradesh Warburg Pincus India Pvt. Ltd., Mumbai 2011 Executed
306 Feasibility study for identification of 61 MW Wind Power Project installation at Puttaparthi in Andhra Pradesh Warburg Pincus India Pvt. Ltd., Mumbai 2011 Executed
307 Consultancy services for preparation of bidding document for 12 MW wind power project at Deogad, District Sindhudurg. MSEDCL, Mumbai 2011 Executed
308 Estimation of wind power potential and preparation of detailed Micro siting map for Wind Power Project site at Nallakonda, Anantapur Distt, Andhra Pradesh NEDCAP, Hyderabad 2011 Executed
309 Techno-Commercial Evaluation of Suzlon's offer for 18.90 MW Wind Power Project in Gujarat. Gujarat State Petroleum Corporation Limited 2011 Executed
310 Energy Estimation of 34x800 kW Enercon WTGs at Project site in Gujarat and Tamil Nadu. Paharpur Cooling Towers Limited 2011 Executed
311 Independent Energy Estimation of 9 MW Capacity Windfarm in the State of Rajasthan. RSPL Limited, Kanpur 2012 Executed
312 Verification & Certification for Power Generation Loss for GSFC's 33 MW Wind Power Project at site Jamanwada, District Kutch Gujarat State Fertilizers & Chemicals Ltd., Gujarat 2012 Executed
313 Independent Energy Estimation for 9 MW Wind Power Project comprising 6 Nos. of Suzlon make 1500 kW WEGs at Akal District, Jaisalmer, Rajasthan GI Wind Power Co. Ltd. 2012 Executed
314 Estimation of wind power potential and preparation of detailed Micro siting map for Wind Power Project site at Borampalli, Anantapur Distt, Andhra Pradesh NEDCAP, Hyderabad 2012 Executed
315 Independent Energy Estimation of 63 MW Wind Power Project considering Vensys 87 Regen make in the State of Karnataka. Green Infra Limited 2012 Executed
316 Project Management of 18.90 MW Wind Power Project in Jamanwada, District Bhuj, Gujarat. Gujarat State Petroleum Corporation Limited 2012 Executed
317 Performance Monitoring of 18.90 MW Wind Power Project in Jamanwada, District Bhuj, Gujarat. Gujarat State Petroleum Corporation Limited 2012 Executed
318 Supervision during commisisoning of Wind Mast, Data Collection, Analysis of Wind Mast Services and Validation/authentication of wind mast data from C-WET at Vadagaon Range, Tal. Mulshil, Pune, Maharashtra. Hindustan Electricity Generation Company Pvt. Ltd. 2012 Executed
319 Independent Energy Estimation of Windfarm of 45 MW Capacity comprising Regen Vensys Machine at Dalot in the State of Rajasthan. Green Infra Limited 2012 Executed
320 Preparation of Detailed Project Report for 45 MW Capacity comprising Regen Vensys Machine at Dalot in the State of Rajasthan. Green Infra Limited 2012 Executed
321 Independent Energy Estimation of 2 MW Capacity at Jamb Amberi & Vaspeth Juniper Hotels Pvt. Ltd. 2012 Executed
322 Independent Energy Estimation of 9 MW Capacity Wind Power Project at Akal in the State of Rajasthan. RSPL Limited, Kanpur 2012 Executed
323 Preparation of Wind Maps and Feasibility Report of four sites in Bangladesh. Regen Powertech Pvt. Ltd. 2012 Executed
324 Estimation of Wind Potential and Preparation of Detailed Project Report (DPR) for proposed 100 MW (approx.) Windfarm in Gokak, Belgaum District of Karnataka. Shapoorji Pallonji Power Projects Pvt. Ltd. 2012 Executed
325 Comparative Energy Generation at Dalot site, Rajasthan. Regen Powertech Pvt. Ltd., Chennai. 2012 Executed
326 Comparative Energy Generation at Rasingapuram site, Tamil Nadu. Regen Powertech Pvt. Ltd., Chennai. 2012 Executed
327 Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project site at Siddannagatta, Kurnool District, Andhra Pradesh New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad 2012 Executed
328 Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project site at pampanoortanda, Anantpur District, Andhra Pradesh New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad 2012 Executed
329 Wind Resource Assessment Report and Map for District of Dhar and Raisen in Madhya Pradesh. The Energy and Resources Institute, New Delhi 2012 Executed
330 Estimation of Energy Yield of 31.5 MW Wind Power Project in Maharashtra. Moser Baer Clean Energy Ltd. 2012 Executed
331 Independent Energy Estimation of 44 MW Wind Power Project in Satara District of Maharashtra. Kenersys India Pvt. Ltd. 2012 Executed
332 Preparation of Feasibility Report for Proposed Wind Power Project in Gujarat Gujarat Industries Power Company Ltd. 2012 Executed
333 Independent Energy Estimation of 10 MW Wind Power Project in Sangli District of Maharashtra. Kenersys India Pvt. Ltd. 2012 Executed
334 Power Performance Test of 18.9 MW Windfarm at Jamanvada, District Kutchh in Gujarat Gujarat State Petroleum Corporation Limited 2012 Executed
335 Yield Assessment of 44.8 MW Wind Power Project in Bijapur District, Karnataka. Moser Baer Clean Energy Limited 2012 Executed
336 Independent Energy Estimation of Energy Yield for 8.4 MW Project in Madhya Pradesh and 1.5 MW in Tamil Nadu. Vaibhavlaxmi Clean Energy LLP 2012 Executed
337 Lender's Independent Engineer (LIE) Services for 25.2 MW Wind Power Project at Jasdan, District Rajkot, Gujarat of RenewWind Energy (Rajkot) Pvt. Ltd. PTC India Financial Services Limited 2012 Executed
338 Consultancy Services for Technical Assistance in Development of RFP and Evaluation of bids for establishment of Windfarm. Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Ltd.; 2012 Executed
339 Consultancy Services Agency to prepare F.S.R. for utilizing mined out land at Panandhro Lignite Project of GMDC Limited for renewable energy generation. Gujarat Mineral Development Corporation Limited 2012 Executed
340 Energy Yield Report for 3 different variants for Bothe windfarm Project in Maharashtra. Bothe Windfarm Development Pvt. Ltd. 2012 Executed
341 Independent Energy Estimation of 70 MW Wind Power Project in Satara District of Maharashtra. Kenersys India Pvt. Ltd. 2012 Executed
342 Wind Resource Assessment for 30 MW at Project site Udgiri in Maharashtra MSPL Limited 2012 Executed
343 Independent Wind Resource Assessment study for 100 MW Wind Power Project in Andhra Pradesh. Acciona Energy India Pvt. Ltd. 2012 Executed
344 Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project at Ramasagaram (Tagguparthi), Anantpur District, Andhra Pradesh. New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad 2012 Executed
345 Estimation of Wind Power Potential and Preparation of Detailed Micro-siting Map for Wind Power Project at Guravapalli, Anantpur District, Andhra Pradesh. New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad 2012 Executed
346 Post Commissioning Monitoring of 52.5 MW Wind Power Project in Gujarat for another two years. Gujarat State Petroluem Corporation Limited 2012 Executed
347 Independent Energy Estimation for 76 MW Wind Power Project at Girijashankarwadi in Maharashtra. Kenersys India Pvt. Ltd. 2013 Executed
348 Independent Energy Estimation of 30 MW Wind Power Project at Dalot site, Rajasthan Tata Power Company Limited, Mumbai 2013 Executed
349 Energy Yield Report for 2 different variants for Bothe windfarm Project in Maharashtra. Bothe Windfarm Development Pvt. Ltd. 2013 Executed
350 Lender's Independent Engineer (LIE) Services for 51 MW Wind Power Project of Mytrah Vayu (Manjira): Pvt. Ltd. at Tiruppur District in Tamil Nadu. PTC India Financial Services Limited 2013 Executed
351 Lender's Independent Engineer (LIE) Services for 30 MW Wind Power Project at Dalot District, Rajasthan. Tata Power Renewable Energy Limited 2013 Executed
352 Estimation of Energy Yield for Proposed Wind Power Project in Ratalam District, M.P. Surajbari WindFarm Development Pvt.Ltd, Mumbai 2013 Executed
353 Lender's Independent Engineer (LIE) Services for 19.5 MW Wind Power Project at Dalot District, Rajasthan. Orange Renewable Power Pvt. Ltd. 2013 Executed
354 Lender's Independent Engineer (LIE) Services for 24 MW Wind Power Project in Maharashtra. YES Bank Limited 2013 Executed
355 Site Identification for 200 MW Wind Power Project at Lahori site in Madhya Pradesh. Inox Wind Infrastructure Limited, Noida 2013 Executed
356 Site Identification for 100 MW Wind Power Project at Katni site in Madhya Pradesh. Renew Power Ventures Pvt. Ltd. 2013 Executed
357 Site Identification for 100 MW Wind Power Project at Maihar site in Madhya Pradesh. Renew Power Ventures Pvt. Ltd. 2013 Executed
358 Site Identification for 100 MW Wind Power Project at Kotrabuzurg site in Madhya Pradesh. Renew Power Ventures Pvt. Ltd. 2013 Executed
359 Site Identification for 100 MW Wind Power Project at Bamhori site in Madhya Pradesh. Trishe Renewable Energy Solutions 2013 Executed
360 Wind Mast Data Collection, Analysis and Validation from C-WET at Vadagaon Range, Tal. Mulshil, Pune, Maharashtra. Hiranandani Renewable Energy Pvt. Ltd., Mumbai 2013 Executed
361 Performance Review of 16.5 MW Wind Power Project at Surajbari site in Gujarat. Surajbari Windfarm Development Pvt. Ltd. 2013 Executed
362 Independent Energy Estimtion and Feasibility study for Chettinad Wind Power Projects in Tamil Nadu Chettinad Cement Corporation Limited 2013 Executed
363 Feasibility Study for 50 MM Wind Power Project in Gujarat for Petronet LNG Limited, New Delhi M.P. Windfarms Limited 2013 Executed
364 Estimation of Energy Yield for one combination of machines at Bothe Windfarm, Maharashtra Bothe Windfarm Development Pvt. Ltd. 2013 Executed
365 Lender's Independent Engineer (LIE) Services for 19.5 MW Wind Power Project Completion Report at Dalot District, Rajasthan Orange Renewable Power Pvt. Ltd. 2013 Executed
366 Lender's Independent Engineer (LIE) Services for 51 MW Wind Power Project of Mytrah Vayu (Manjira): Pvt. Ltd. at Tiruppur District in Tamil Nadu. Union Bank of India Ltd. 2013 Executed
367 Preparation of Detailed Project Report for 54 MW Wind Power Project at Tagguparthi, District Ananthpur, Andhra Pradesh. Energon Power Resources Pvt. Ltd., Bangalore. 2013 Executed
368 Feasibility Study for Wind Power Project in Kochi, Kerala for Petronet LNG Limited, New Delhi M.P. Windfarms Limited 2013 Executed
369 Estimation of energy yield / validation of 11 Nos. K-82, 2 MW WEGs & 7 Nos. K-110, 2.4 MW WEGs at Girijashankarwadi in Maharashtra Kenersys India Pvt. Ltd. 2013 Executed
370 Estimation of Energy Yield for 97/130 Locations with three different combinations of machines. Bothe Windfarm Development Pvt. Ltd. 2013 Executed
371 Preparation of Bid Document/NIT and Bid evaluation including pre-bid meeting for 40 MW Wind Power Project for Petronet LNG Limited in Gujarat. M.P. Windfarms Limited 2013 Executed
372 Estimation of Energy Yield for 97/130 Locations with three different combinations of machines. Bothe Windfarm Development Pvt. Ltd. 2013 Executed
373 Site Identification for 400 MW Wind Power Project at Jura site in Kachchh, Gujarat. Srijan Energy Systems Ltd. 2013 Executed
374 Site Identification for 24 MW Wind Power Project at Thagi site in Mandsaur District of Madhya Pradesh. Consolidated Energy Consultants Ltd. 2013 Executed
375 Site Identification for 50 MW Wind Power Project at Katna site in Mandsaur District of Madhya Pradesh. Consolidated Energy Consultants Ltd. 2013 Executed
376 Site Identification for 100 MW Wind Power Project at Nipaniya site in Mandsaur District of Madhya Pradesh. Inox Wind Infrastructure Limited, Noida 2013 Executed
377 Site Identification for 50 MW Wind Power Project at Pasun site in Rajsamand District of Rajasthan. Inox Wind Infrastructure Limited, Noida 2013 Executed
378 Site Identification for 100 MW Wind Power Project at Annupura site in Limkheda District of Gujarat.   2013 Executed
379 Site Identification for 200 MW Wind Power Project at Taladari site in Rajsamand District of Rajasthan.   2013 Executed
380 Appointment of an Engineering Consultant for Setting up of up to 300 MW Wind Power Project in the State of Gujarat. Gujarat Industries Power Company Ltd 2014 Executed
381 Civil Assessment Work for 10.5 MW Project in Madhya Pradesh. Sterling Agro Industries Ltd. 2014 Executed
382 Techno-Economic Feasibility Report (TEFR) for onshore Wind farm at Devghar, Maharashtra. Hiranandani Renewable Energy Pvt. Ltd., 2014 Executed
383 Energy Validation Report for 10 MW Wind Power Project at Girijashankarwadi site, Satara District in Maharashtra. Kenersys India Pvt. Ltd. 2014 Executed
384 Micro-siting of 100 Nos. Vestas V-100 WEG in the area adjacent to the windfarm project in Mamatkheda, Ratlam District of M.P. Surajbhari Windfarm Pvt. Ltd. 2014 Executed
385 Post Commissioning Monitoring of 18.9 MW in Gujarat - Extended period Gujarat State Petroluem Corporation Limited 2014 Executed
386 Energy Estimation of 40 MW Wind Power Project in Maharashtra Inox Renewables Limited 2014 Executed
387 Energy Estimation of 28 MW Wind Power Project in Kukru, Madhya Pradesh Inox Renewables Limited 2014 Executed
388 Estimation of wind energy resource assessment of 20 MW Wind Power Project consisting of 10 Nos. WTG of Gamesa G-97 at Dewas in M.P. Panama Wind Energy Krishna Pvt. Ltd. 2014 Executed
389 Site Identificaton for 100 MW Wind Power Project at Shamgarh, District Mandsaur in Madhya Pradesh. Panama Wind Energy Krishna Pvt. Ltd. 2014 Executed
390 Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Bhandariya site, Taluka Sailana, Ratlam for 15 Nos. WEGs in Forest Land Renew Power Pvt. Ltd., Mumbai 2014 Executed
391 Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Kharsod Khuri site, Taluka Barnagar, Ujjain for 34 Nos. WEGs in Govt. Land Renew Power Pvt. Ltd., Mumbai 2014 Executed
392 Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Ralayta site, Taluka Badnawar, Dhar for 22 Nos. WEGs in Govt. Land and 20 Nos. WEGs in Forest Land Renew Power Pvt. Ltd., Mumbai 2014 Executed
393 Consultancy Services for Site Identification for development of wind power project in Madhya Pradesh at Mawdipura site, Taluka Dhar , Dhar for 26 Nos. WEGs in Forest Land Renew Power Pvt. Ltd., Mumbai 2014 Executed
394 Installation and commissioning of 100 m height wind monitoring mast complete with necessary sensors for wind measurement and temperature measurmeent at a suitable location on the identified site in Mandsaur District of Madhya Pradesh. Panama Wind Energy Krishna Pvt. Ltd. 2014 Executed
395 Independent Energy Yield Assessment Report for 54 MW Wind Power Project at Rojmal near Amreli in Gujarat. Tata Power Renewable Energy Limited 2014 Executed
396 Pre-Feasibility Report for 30 MW Wind Power Project in Madhya Pradesh Aspirance Services, France 2014 Executed
397 Lender's Independent Engineer (LIE) Services for 36 MW Wind Power Project of Jasdan Energy Pvt. Ltd. In Gujarat. M State Bank of India, Mumbai 2014 Executed
398 Energy yield estimation for proposed 10 MW Wind Power Project at Lahas Village, Taluka: Bhaisdehi, District Betul, Madhya Pradesh. Radical Energy, Pune 2014 Executed
399 Detailed DGPS Survey and Preparation of Detailed Project for 100 MW Wind Power Project at Shamgarh, District of Mandsaur, Madhya Pradesh. Panama Wind Energy Krishna Pvt. Ltd. 2014 Executed
400 Wind Data Analysis and Estimation of Energy Yield for different make WEGs at Chimmanakatti in Bagalkot District, Karnataka. MSPL Limited 2014 Executed
401 Micro-siting report for each WEGs for proposed Wind Power Project at Chimmanakatti in Bagalkot District, Karnataka. MSPL Limited 2014 Executed
402 Preparation of Detailed Project Report for proposed wind power project at Chimmanakatti in Bagalkot District, Karnataka. MSPL Limited 2014 Executed
403 Civil Assessment Work Foundation casting for 2 Machines in Andhra Pradesh and 4 Machines in Maharasthra. Sterling Agro Industries Ltd. 2014 Executed
404 Lender's Independent Engineer (LIE) Services for Gamesa's 40 MW Wind Power Project at Gunga, District Barmer in Rajasthan of Clean Wind Power (Devgarh), New Delhi. IndusInd Bank, Mumbai 2014 Executed
405 Lender's Independent Engineer (LIE) Services for Inox's 40 MW Wind Power Project at Dangri, District Jaisalmer in Rajasthan of Clean Wind Power (Devgarh), New Delhi. IndusInd Bank, Mumbai 2014 Executed
406 Lender's Independent Engineer (LIE) Services for 50.4 MW Wind Power Project at Jaisalmer District in Rajasthan for Ostro Renewable Energy , New Delhi. PTC India Financial Services Limited 2015 Executed
407 Appointment as consultant for post commissioning monitoring of 52.5 MW Wind Power Project at Jakhau site Kutch District, Gujarat for one year. Gujarat State Petroleum Corporation Limited 2015 Under Execution
408 Estimation of Energy Yield Assessment for Wind Power Project in Ratlam District of Madhhya Pradesh considering one variant. Continuum Energy 2015 Executed
409 Consultancy for As-Built Wind Resource Assessment and Energy Yield Estimation for 45 MW Windfarm site at Dalot in Rajasthan. Green Infra Limited 2015 Executed
410 Consultancy support to conduct study on Roadmap for developing conducive framework for Repowering of Old Wind Turbines and assessment of maket potential in Inida Idam Infrastructure Advisory Pvt. Ltd. 2015 Executed
411 Consultancy for estimation of Energy Yield Assessment for your proosed wind power project in Pathenagar & Peraballi, District Kurnool in Andhra Pradesh. SunEdison Solar Power 2015 Executed
412 Consultancy Fee for estimation of Energy Yield Assessment for your proposed 26 MW Wind Power project in Amreli, Gujarat for two variants. Kintech Synergy Pvt. Ltd. 2015 Executed
413 Estimation of Wind Power Potential at Molagavalli, Kurnool District and Preparation of Detailed Micro siting Map New & Renewable Energy Development Corporporation of Andhra Pradesh Limited, Hyderabad 2015 Executed
414 Consultancy for estimation of Energy Yield Assessment for 30 MW wind power project in Kundhda, District Bhavnagar in Gujarat. SunEdison Solar Power 2015 Executed
415 Consultancy for Energy Yield Assessment for 2 Nos. 2.1 MW Suzlon Machines of 80 m Hub height and 1 No. S-97, 2.1 MW Suzlon machine of 90 m hub height at Tirumangalakurichi, Kovilpatti Taluk, Tuticorn District of Tamil Nadu. GHCL Limited 2015 Executed
416 Consultancy for Wind Resource Assessment and Energy Yield Report for 193 MW wind power project in Mahuva, Matalpur & Kuchhdi in Gujarat. K.P. Energy Pvt. Ltd., Surat 2015 Executed
417 Appointment of an Engineering Consultant for Setting up of up to 300 MW Wind Power Project in the State of Gujarat. Gujarat Industries Power Company Ltd 2015 Executed
418 Conultancy for Energy Yield Assessment of 50 MW Windfarm Project at site Lahori in Madhya Pradesh. Inox Wind Infrastructure Limited, Noida 2015 Executed
419 Energy Yield Assessment of 164 WEG Locations of Wind Power Project in Mammatkheda, District Ratlam, Madhya Pradesh SkyZen Infrabuild Pvt Ltd, Mumbai 2015 Executed
420 Energy Yield Assessment of 3 Nos. 2.1 MW Suzlon make machines at Matalpar, District Bhavnagar in Gujarat. K.P.L. International Ltd. 2015 Executed
421 Energy Yield Assessment of Gamesa's 13 Nos. G-97 2 MW Machiens in Amreli District of Gujarat Kintech Synergy Pvt. Ltd. 2015 Executed
422 3rd party Energy Yield Assessment for 20 MW Wind Power Project comprising 2 MW Inox Machines at Nipaniya, District Mandsaur in Madhya Pradesh. Yogesh Agencies & Investments Pvt. Ltd., Mumbai 2015 Executed
423 3rd party Energy Yield Assessment for 7.5 MW Wind Power Project comprising 1.5 MW Regen make Machines at Hathuniya, District Mandsaur in Madhya Pradesh. Yogesh Agencies & Investments Pvt. Ltd., Mumbai 2015 Executed
424 Lender's Independent Engineer (LIE) Services for 90.10 MW Wind Power Project comprising of 53 Nos. GE - 1.7 MW Machines at Habour & Mokala in the District of Jaisalmer, Rajasthan being developed by M/s Mytrah Vayuy Som Pvt. Ltd. PFC Limited, New Delhi 2015 Executed
425 Lender's Independent Engineer (LIE) Services for 50 MW Wind Power Project comprising of 25 Nos. Inox - 2 MW Machines at Nipaniya in the District of Mandsaur, Rajasthan being developed by M/s Mytrah Vayuy Som Pvt. Ltd. PFC Limited, New Delhi 2015 Executed
426 Lender's Independent Engineer (LIE) Services for 32 MW Wind Power Project comprising of 40 Nos. Wind World - 800 kW Machines at Sipla in the District of Jaisalmer, Rajasthan being developed by M/s Sipla Wind Energy Ltd. PTC Financial Services Ltd. 2015 Executed
427 Lender's Independent Engineer (LIE) Services for 34.4 MW Wind Power Project comprising of 43 Nos. Wind World - 800 kW Machines at Jogihali in the District of Chitradurga, Karnataka being developed by M/s Sipla Wind Energy Ltd. PTC Financial Services Ltd. 2015 Executed
428 Lender's Independent Engineer (LIE) Services for 50 MW Wind Power Project comprising of 25 Nos. Gamesa 2 MW Machines at Kukru in the District of Betul, Madhya Pradesh being developed by M/s Kukru Wind Power Pvt. Ltd. (Atria Power) PTC Financial Services Ltd. 2015 Executed
429 Independent Energy Estimation of 4.2 MW comprising 2x2.1 MW Suzlon Machines at Ringnod in the District of Ratlam, Madhya Pradesh. Ruchi Renewable Energy Pvt. Ltd. 2015 Executed
430 Independent Energy Estimation of 10.5 MW comprising 7x1.5 MW Regen make Machines at Ghatiya in the District of Ratlam, Madhya Pradesh. Ruchi Renewable Energy Pvt. Ltd. 2015 Executed
431 Independent Energy Yield Assessment t for 20 MW Wind Power Project comprisng of 10 machines of Inox make at South Bhud in Maharashtra. Inox Renewables Limited 2015 Executed
432 Independent Energy Estimation of 4.2 MW comprising 2x2.1 MW Suzlon Machines at Ringnod in the District of Ratlam, Madhya Pradesh. Ruchi Renewable Energy Pvt. Ltd. 2016 Executed
433 Supervision during Foundation casting of 15 Nos. 800 kW Wind World WEGs at Anantpur District in Andhra Pradesh. Sterling Agro Industries Ltd. 2016 Executed
434 Supervision during Foundation casting of 5 Nos. 2 MW Vestas make WEGs at Charabara site, Dwarka District in Gujarat. Sterling Agro Industries Ltd. 2016 Executed
435 Technical Due Diligence and Micrositing including PLF& Energy Estimation for 30.75 MW Wind Power Project at Vaspeth in Maharashtra. Tata Power Company Limited, Mumbai 2016 Executed
436 Technical Due Diligence and Micrositing including PLF& Energy Estimation for 100.5 MW Wind Power Project at Echanta in Tamil Nadu. Tata Power Company Limited, Mumbai 2016 Executed
437 Performance evaluation of 32 MW Wind Power Project at Girijashankarwadi in Maharashtra Tata Power Renewable Energy Limited 2016 Executed
438 Independent Energy Estimation of 30 MW Wiind Power Project at Lahori site in Madhya Pradesh. Inox Renewables Limited 2016 Executed
439 Independent Energy Yield Assessment of 10 MW Wind Power Project at Nipaniya in Madhya Pradesh Inox Renewables Limited 2016 Executed
440 Lenders Indpendent Engineer Services for 50 MW Wind Power Project at Lahori Village, Shajapur District of Madhya Pradesh Tata Power Renewable Energy Limited 2016 Executed
441 Lenders Independent Engineer Services for 40.5 MW Wind Power Project at Tirumalayapalli, District Cuddapah in Andhra Pradesh. IndusInd Bank, Mumbai 2016 Executed
442 Performance evaluation of 10 MW Wind Power Project at Visapur site in Maharashtra. Tata Power Renewable Energy Limited 2016 Executed
443 Addional exercise work for Independent Energy Yield Assessment of 30 MW Wind Power Project for change of one location at Lahori Project in Madhya Pradesh. Inox Renewables Limited 2016 Executed
444 Technical Due Diligence for 273.5 MW Wind Power Project operational at in different States in India. Hindustan Zinc Ltd., Udaipur 2016  
445 Performance review of 40 MW Wind Power Project at Dangri, Jaisalmer, Rajasthan being developed by Clean Wind Power (Devgarh) Pvt. Ltd. IndusInd Bank, Mumbai 2016 Executed
446 Lenders Indpendent Engineer Services for 26 MW Wind Power Project at District Morbi in Gujarat being developed by M/s Ratabhe Renewable Energy Pvt. Ltd. State Bank of India, Mumbai 2016 Executed
447 Lenders Indpendent Engineer Services for 26 MW Wind Power Project at District Amreli in Gujarat being developed by M/s Amreli Renewable Energy Pvt. Ltd. State Bank of India, Mumbai 2016 Executed
448 Energy Yield Assessment of 28 Nos. Suzlon Make 2.1 MW Machines at Jodiya site, District Jamnagar in Gujarat. GHCL Limited 2016 Executed
449 Lenders Indpendent Engineer Services for 29.4 MW Wind Power Project at Dewas District in Madhya Pradesh being developed by M/s AVP Power Infra Pvt. Ltd. (Ostro Renewable Energy) PTC Financial Services Ltd. 2016 Executed
450 Lenders Indpendent Engineer Services for 29.4 MW Wind Power Project at Dewas District in Madhya Pradesh being developed by M/s Badoni Power Pvt. Ltd. (Ostro Renewable Energy) PTC Financial Services Ltd. 2016 Executed
451 Energy Yield Assessment of 13 Nos. Suzlon Make 2.1 MW Machines at Jodiya site, District Jamnagar in Gujarat. GHCL Limited 2016 Executed
452 Lenders Indpendent Engineer Services for 26 MW Wind Power Project at Rojmal & Viravadi, Taluk Gadagada in Gujarat being developed by M/s Raipar Renewable Energy Pvt. Ltd. State Bank of India, Mumbai 2016 Executed
453 Lenders Indpendent Engineer Services for 62 MW Wind Power Project at Village Godalada in Gujarat being developed by M/s Sukhavala Renewable Energy Pvt. Ltd. State Bank of India, Mumbai 2016 Executed
454 Lender's Independent Engineer services for 25.3 MW Wind Power Project at Anantapur District in Andhra Pradesh being developed by M/s Dhanu Wind Park Pvt. Ltd. PTC India Financial Services Ltd. 2016 Executed
455 Energy Audit of 6 Nos. Enercon make 800 kW WTG installed at Sankaneri, Tirunelveli District of Tamil Nadu. GHCL Limited 2017 Executed
456 Energy Audit of 6 Nos. Enercon make 600 kW WTG installed at Dharapuram, Coimbatore District of Tamil Nadu. GHCL Limited 2017 Executed
457 Lender's Independent Engineer services for 36 MW Wind Power Project at Shajapur District in being developed by M/s Renew Wind Energy Pvt. Ltd. PTC India Financial Services Ltd. 2017 Executed
458 Performance Analysis for 2.1 MW Wind Turbine Suzlon make installed at Matalpur in Gujarat. Sonu Handicrafts, Jaipur 2017 Executed
459 Performance Analaysis of 250 kW Wind Turbine installed at Jaigaon site in Satara District of Maharashtra. Sanjay Ahuja Property Trade, Mumbai 2017 Executed
460 Technical Due Diligence of India based Windfarms bearing capacity of 24 MW, 39.1 MW& 40 MW respectively in District of Ananthpur & Kurnool in Andhra Pradesh, India. Stantec S.p.A., Italy 2017 Executed
461 Appointment of Engineering Consultant Consultancy Services for setting up of 200 MW Wind Power Project in Gujarat Gujarat Industries Power Company Ltd. 2017 Under Execution
462 Feasibility study of Wind Power Project in Madhya Pradesh Vardhman Acrylics Ltd. 2017 Under Execution
463 Energy Yield Assessment of 20 MW Wind Power Project in Karnataka. Shree Cements Ltd. 2017 Executed
464 Energy Yield Assessment for 20 MW Wind Power project of change of location in Karnataka. Shree Cements Ltd. 2017 Executed
465 Energy Yield Assessment & Selecton of 9 best locations Amarjothi Spinning Mills Ltd. 2018 Executed
466 Wind Resource Assessment, Energy Yield Assessment & Performance Analysis report for Karnataka Wind Power Project MSPL Limited 2018 Under Execution
467 Wind Resource Assessment, Energy Yield Assessment and Micro-siting for Hospet Wind Power Project Ramgad Minerals and Mining Ltd. 2018 Executed
468 Technical consultancy services for Machine Health Assessment and Asset Management of 24 MW Wind Power Project in Rajasthan. RBL Bank 2018 Under Execution
469 Lender's Independent Engineer services for 50.4 MW Wind Power Project at Koppal District in Karnataka being developed by M/s Skerion Renewable Energy Pvt. Ltd. PTC India Financial Services Ltd. 2018 Executed
470 Lender's Independent Engineer services for 52.50 MW Wind Power Project at Koppal District in Karnataka being developed by M/s Saroja Renewable Energy Pvt. Ltd. PTC India Financial Services Ltd. 2018 Executed
471 Wind Resource Assessment, Energy Yield Assessment and Micro-siting for additional two variants for Hospet Wind Power Project Ramgad Minerals and Mining Ltd. 2018 Executed
31.03.2018

 

 

 

 